Skip to main content
RateWatt

Biomass power plant, Georgia

Brunswick Cellulose biomass power plant, Georgia

Brunswick Cellulose is a 72.2 MW biomass power plant in Glynn County, Georgia, operated by Brunswick Cellulose LLC, and it generated 216,730 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Georgia, and its capacity factor sits at the 11th percentile of U.S. biomass plants. By 2025 generation it ranks 2,381st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

72.2 MWNameplate capacity
25%Capacity factor, 2025, 11th percentile, on 72.2 MW net summer
0.1%Of GA generation, 2025
59 yearsAverage generator age, by MW

How hard does the Brunswick Cellulose plant run compared with other biomass plants?

The Brunswick Cellulose plant had a capacity factor of 25% in 2025 on 72.2 MW of net summer capacity, the 11th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 91 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Brunswick Cellulose25%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Brunswick Cellulose plant generating more or less than last year?

Generation at Brunswick Cellulose fell 36.2% from 2024 to 2025, from 339,686 MWh to 216,730 MWh. Through August 2026 it is running 30.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024339,686
2025216,730
2026 through August201,295
2025, same months154,179
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202629,539
July 202629,498
June 202632,601
May 202622,503
April 20266,995
March 202631,223
February 202623,286
January 202625,650
December 202512,506
November 20257,354
October 202512,429
September 202530,262
August 202527,593
July 202524,770
June 202520,690
May 20258,687
April 20255,638
March 202519,613
February 202522,593
January 202524,595
December 202422,028
November 202422,776
October 202420,024
September 202432,797
August 202432,584
July 202433,734
June 202433,797
May 202438,545
April 202423,807
March 20249,017
February 202435,498
January 202435,079

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Brunswick Cellulose plant?

Brunswick Cellulose made 0.1% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. By capacity it is the 80th largest of 263 plants in Georgia, the 3,311th largest of 14,327 in the U.S. and the 45th largest of 585 biomass plants. By 2025 generation it is the 53rd largest of 242 generating plants in the state.

Brunswick Cellulose within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)7242,7190.2%
Generation (MWh)216,730144,967,3520.1%
Biomass capacity (MW)728828.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Brunswick Cellulose plant, and when do they retire?

3 operable generators total 72.2 MW, with an average age of 59 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s1913%none reported
1960s15069%none reported
1990s11318%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN3OperatingWood/Wood Waste Biomass91954n/a
GEN4OperatingWood/Wood Waste Biomass501960n/a
GEN5OperatingWood/Wood Waste Biomass131996n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Brunswick Cellulose plant?

EIA lists no joint owners for Brunswick Cellulose. Brunswick Cellulose LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Brunswick Cellulose plant?

Brunswick Cellulose is in Brunswick, Glynn County, Georgia, at 31.1731° N, 81.5192° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Georgia are similar in size?

Georgia has 23 operable biomass plants with 882 MW of capacity, and Brunswick Cellulose's 72.2 MW is 8% of that.

Biomass plants in Georgia around this size
PlantCountyMW2025 MWh
Flint River OperationsMacon77416,738
Graphic Packaging Intl Macon MillBibb74325,571
Port Wentworth MillChatham72398,817
Brunswick CelluloseGlynn72157,888
Inland Paperboard Packaging RomeFloyd70366,272
PCA-Valdosta MillLowndes70298,618
Jesup PlantWayne70415,698

Source: EIA Forms EIA-860 and EIA-923, 2025.