PCA-Valdosta Mill biomass power plant, Georgia

PCA-Valdosta Mill is a 69.9 MW biomass power plant in Lowndes County, Georgia, operated by PCA-Valdosta Mill, and it generated 310,637 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Georgia, and its capacity factor sits at the 51st percentile of U.S. biomass plants. By 2025 generation it ranks 1,932nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

69.9 MWNameplate capacity
49%Capacity factor, 2025, 51st percentile, on 69.9 MW net summer
0.2%Of GA generation, 2025
28 yearsAverage generator age, by MW

How hard does the PCA-Valdosta Mill plant run compared with other biomass plants?

The PCA-Valdosta Mill plant had a capacity factor of 49% in 2025 on 69.9 MW of net summer capacity, the 51st percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 178 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
PCA-Valdosta Mill49%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the PCA-Valdosta Mill plant generating more or less than last year?

Generation at PCA-Valdosta Mill fell 3.7% from 2024 to 2025, from 322,609 MWh to 310,637 MWh.

Net generation by period
PeriodMWh
2024322,609
2025310,637
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202527,622
November 202525,793
October 202525,688
September 202523,975
August 202528,215
July 202527,321
June 202529,017
May 202527,497
April 202524,880
March 202526,119
February 202517,370
January 202527,143
December 202427,555
November 202427,766
October 202425,883
September 202426,203
August 202428,077
July 202428,249
June 202429,675
May 202427,162
April 202426,032
March 202426,606
February 202424,538
January 202424,861

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the PCA-Valdosta Mill plant?

PCA-Valdosta Mill made 0.2% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 86th largest of 263 plants in Georgia, the 3,370th largest of 14,327 in the U.S. and the 50th largest of 585 biomass plants. By 2025 generation it is the 41st largest of 242 generating plants in the state.

PCA-Valdosta Mill within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)7042,7190.2%
Generation (MWh)310,637144,967,3520.2%
Biomass capacity (MW)708827.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the PCA-Valdosta Mill plant, and when do they retire?

3 operable generators total 69.9 MW, with an average age of 28 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s21825%none reported
2010s15275%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TG1OperatingWood/Wood Waste Biomass101954n/a
TG2OperatingWood/Wood Waste Biomass81954n/a
TG3OperatingWood/Wood Waste Biomass522011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the PCA-Valdosta Mill plant?

EIA lists no joint owners for PCA-Valdosta Mill. PCA-Valdosta Mill operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the PCA-Valdosta Mill plant?

PCA-Valdosta Mill is in Valdosta, Lowndes County, Georgia, at 30.6944° N, 83.3031° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Georgia are similar in size?

Georgia has 23 operable biomass plants with 882 MW of capacity, and PCA-Valdosta Mill's 69.9 MW is 8% of that.

Biomass plants in Georgia around this size
PlantCountyMW2025 MWh
Port Wentworth MillChatham72398,817
Brunswick CelluloseGlynn72157,888
Inland Paperboard Packaging RomeFloyd70366,272
PCA-Valdosta MillLowndes70298,618
Jesup PlantWayne70415,698
Piedmont Green PowerLamar60407,298
GRP Franklin Renewable Energy FacilityFranklin58384,773

Source: EIA Forms EIA-860 and EIA-923, 2025.