Biomass power plant, Georgia
Piedmont Green Power biomass power plant, Georgia
Piedmont Green Power is a 60 MW biomass power plant in Lamar County, Georgia, operated by Piedmont Green Power LLC, and it generated 407,298 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Georgia, and its capacity factor sits at the 95th percentile of U.S. biomass plants. By 2025 generation it ranks 1,569th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Piedmont Green Power plant run compared with other biomass plants?
The Piedmont Green Power plant had a capacity factor of 85% in 2025 on 55 MW of net summer capacity, the 95th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 309 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Piedmont Green Power | 85% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Piedmont Green Power plant generating more or less than last year?
Generation at Piedmont Green Power fell 0.1% from 2024 to 2025, from 407,895 MWh to 407,298 MWh. Through August 2026 it is running 4.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 407,895 |
| 2025 | 407,298 |
| 2026 through August | 287,334 |
| 2025, same months | 275,433 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 40,293 |
| July 2026 | 33,011 |
| June 2026 | 38,268 |
| May 2026 | 40,595 |
| April 2026 | 20,100 |
| March 2026 | 39,522 |
| February 2026 | 35,525 |
| January 2026 | 40,020 |
| December 2025 | 40,178 |
| November 2025 | 31,244 |
| October 2025 | 22,209 |
| September 2025 | 38,234 |
| August 2025 | 39,937 |
| July 2025 | 39,528 |
| June 2025 | 32,477 |
| May 2025 | 37,279 |
| April 2025 | 19,756 |
| March 2025 | 30,961 |
| February 2025 | 35,578 |
| January 2025 | 39,917 |
| December 2024 | 40,187 |
| November 2024 | 30,254 |
| October 2024 | 22,608 |
| September 2024 | 38,745 |
| August 2024 | 27,190 |
| July 2024 | 39,459 |
| June 2024 | 38,300 |
| May 2024 | 39,915 |
| April 2024 | 20,886 |
| March 2024 | 39,899 |
| February 2024 | 33,082 |
| January 2024 | 37,370 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Piedmont Green Power plant, and when do they retire?
1 operable generator totals 60 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 60 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Wood/Wood Waste Biomass | 60 | 2013 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Piedmont Green Power plant?
EIA lists no joint owners for Piedmont Green Power. Piedmont Green Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Piedmont Green Power plant?
Piedmont Green Power is in Barnesville, Lamar County, Georgia, at 33.0453° N, 84.1256° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in Georgia are similar in size?
Georgia has 23 operable biomass plants with 882 MW of capacity, and Piedmont Green Power's 60 MW is 7% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Inland Paperboard Packaging Rome | Floyd | 70 | 366,272 |
| PCA-Valdosta Mill | Lowndes | 70 | 298,618 |
| Jesup Plant | Wayne | 70 | 415,698 |
| Piedmont Green Power | Lamar | 60 | 407,298 |
| GRP Franklin Renewable Energy Facility | Franklin | 58 | 384,773 |
| GRP Madison Renewable Energy Facility | Madison | 58 | 423,403 |
| Albany Green Energy | Dougherty | 55 | 106,085 |
Source: EIA Forms EIA-860 and EIA-923, 2025.