Skip to main content
RateWatt

Biomass power plant, Georgia

Piedmont Green Power biomass power plant, Georgia

Piedmont Green Power is a 60 MW biomass power plant in Lamar County, Georgia, operated by Piedmont Green Power LLC, and it generated 407,298 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Georgia, and its capacity factor sits at the 95th percentile of U.S. biomass plants. By 2025 generation it ranks 1,569th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

60 MWNameplate capacity
85%Capacity factor, 2025, 95th percentile, on 55 MW net summer
0.3%Of GA generation, 2025
12 yearsAverage generator age, by MW

How hard does the Piedmont Green Power plant run compared with other biomass plants?

The Piedmont Green Power plant had a capacity factor of 85% in 2025 on 55 MW of net summer capacity, the 95th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 309 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Piedmont Green Power85%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Piedmont Green Power plant generating more or less than last year?

Generation at Piedmont Green Power fell 0.1% from 2024 to 2025, from 407,895 MWh to 407,298 MWh. Through August 2026 it is running 4.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024407,895
2025407,298
2026 through August287,334
2025, same months275,433
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202640,293
July 202633,011
June 202638,268
May 202640,595
April 202620,100
March 202639,522
February 202635,525
January 202640,020
December 202540,178
November 202531,244
October 202522,209
September 202538,234
August 202539,937
July 202539,528
June 202532,477
May 202537,279
April 202519,756
March 202530,961
February 202535,578
January 202539,917
December 202440,187
November 202430,254
October 202422,608
September 202438,745
August 202427,190
July 202439,459
June 202438,300
May 202439,915
April 202420,886
March 202439,899
February 202433,082
January 202437,370

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Piedmont Green Power plant?

Piedmont Green Power made 0.3% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.1% of the state's 42,719 MW of capacity. Its share of output is 2.0 times its share of capacity. By capacity it is the 91st largest of 263 plants in Georgia, the 3,517th largest of 14,327 in the U.S. and the 66th largest of 585 biomass plants. By 2025 generation it is the 27th largest of 242 generating plants in the state.

Piedmont Green Power within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)6042,7190.1%
Generation (MWh)407,298144,967,3520.3%
Biomass capacity (MW)608826.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Piedmont Green Power plant, and when do they retire?

1 operable generator totals 60 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s160100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingWood/Wood Waste Biomass602013n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Piedmont Green Power plant?

EIA lists no joint owners for Piedmont Green Power. Piedmont Green Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Piedmont Green Power plant?

Piedmont Green Power is in Barnesville, Lamar County, Georgia, at 33.0453° N, 84.1256° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Georgia are similar in size?

Georgia has 23 operable biomass plants with 882 MW of capacity, and Piedmont Green Power's 60 MW is 7% of that.

Biomass plants in Georgia around this size
PlantCountyMW2025 MWh
Inland Paperboard Packaging RomeFloyd70366,272
PCA-Valdosta MillLowndes70298,618
Jesup PlantWayne70415,698
Piedmont Green PowerLamar60407,298
GRP Franklin Renewable Energy FacilityFranklin58384,773
GRP Madison Renewable Energy FacilityMadison58423,403
Albany Green EnergyDougherty55106,085