Biomass power plant, Georgia

GRP Franklin Renewable Energy Facility, Georgia

GRP Franklin Renewable Energy Facility is a 58 MW biomass power plant in Franklin County, Georgia, operated by GRP Franklin Renewable Energy Facility, LLC, and it generated 384,773 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Georgia, and its capacity factor sits at the 90th percentile of U.S. biomass plants. By 2025 generation it ranks 1,638th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

58 MWNameplate capacity
76%Capacity factor, 2025, 90th percentile, on 58 MW net summer
0.3%Of GA generation, 2025
6 yearsAverage generator age, by MW

How hard does the GRP Franklin Renewable Energy Facility plant run compared with other biomass plants?

The GRP Franklin Renewable Energy Facility plant had a capacity factor of 76% in 2025 on 58 MW of net summer capacity, the 90th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 276 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
GRP Franklin Renewable Energy Facility76%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the GRP Franklin Renewable Energy Facility plant generating more or less than last year?

Generation at GRP Franklin Renewable Energy Facility fell 1.0% from 2024 to 2025, from 388,474 MWh to 384,773 MWh. Through August 2026 it is running 16.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024388,474
2025384,773
2026 through August282,746
2025, same months242,152
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202636,936
July 202638,351
June 202633,818
May 202641,554
April 202640,635
March 202620,030
February 202636,719
January 202634,703
December 202540,702
November 202538,473
October 202526,955
September 202536,491
August 202530,448
July 202529,958
June 202535,516
May 202532,196
April 202520,345
March 202538,920
February 202522,231
January 202532,538
December 202435,322
November 202437,675
October 202428,884
September 202434,921
August 202440,447
July 202433,574
June 202425,887
May 202435,777
April 202432,763
March 202439,468
February 202416,948
January 202426,808

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the GRP Franklin Renewable Energy Facility plant?

GRP Franklin Renewable Energy Facility made 0.3% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.1% of the state's 42,719 MW of capacity. Its share of output is 2.0 times its share of capacity. By capacity it is the 94th largest of 263 plants in Georgia, the 3,583rd largest of 14,327 in the U.S. and the 70th largest of 585 biomass plants. By 2025 generation it is the 29th largest of 242 generating plants in the state.

GRP Franklin Renewable Energy Facility within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)5842,7190.1%
Generation (MWh)384,773144,967,3520.3%
Biomass capacity (MW)588826.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the GRP Franklin Renewable Energy Facility plant, and when do they retire?

1 operable generator totals 58 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s158100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GENOperatingWood/Wood Waste Biomass582019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the GRP Franklin Renewable Energy Facility plant?

EIA lists no joint owners for GRP Franklin Renewable Energy Facility. GRP Franklin Renewable Energy Facility, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the GRP Franklin Renewable Energy Facility plant?

GRP Franklin Renewable Energy Facility is in Carnesville, Franklin County, Georgia, at 34.3761° N, 83.3306° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Georgia are similar in size?

Georgia has 23 operable biomass plants with 882 MW of capacity, and GRP Franklin Renewable Energy Facility's 58 MW is 7% of that.

Biomass plants in Georgia around this size
PlantCountyMW2025 MWh
PCA-Valdosta MillLowndes70298,618
Jesup PlantWayne70415,698
Piedmont Green PowerLamar60407,298
GRP Franklin Renewable Energy FacilityFranklin58384,773
GRP Madison Renewable Energy FacilityMadison58423,403
Albany Green EnergyDougherty55106,085
Clearwater Paper Corporation - AugustaRichmond46n/a

Source: EIA Forms EIA-860 and EIA-923, 2025.