Skip to main content
RateWatt

Biomass power plant, Georgia

Albany Green Energy biomass power plant, Georgia

Albany Green Energy is a 54.5 MW biomass power plant in Dougherty County, Georgia, operated by Albany Green Energy, LLC, and it generated 106,169 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Georgia, and its capacity factor sits at the 10th percentile of U.S. biomass plants. By 2025 generation it ranks 3,328th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

54.5 MWNameplate capacity
24%Capacity factor, 2025, 10th percentile, on 49.5 MW net summer
0.1%Of GA generation, 2025
8 yearsAverage generator age, by MW

How hard does the Albany Green Energy plant run compared with other biomass plants?

The Albany Green Energy plant had a capacity factor of 24% in 2025 on 49.5 MW of net summer capacity, the 10th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Albany Green Energy24%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Albany Green Energy plant generating more or less than last year?

Generation at Albany Green Energy fell 67.3% from 2024 to 2025, from 325,030 MWh to 106,169 MWh. Through August 2026 it is running 114.2% ahead of the same months of 2025.

7 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
2024325,030
2025106,169
2026 through August232,437
2025, same months108,502
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,544
July 202632,900
June 202631,950
May 202618,546
April 202622,677
March 202632,288
February 202629,566
January 202631,966
December 20256,785
November 2025-2,847
October 2025-3,169
September 2025-3,102
August 2025-3,215
July 2025-3,308
June 2025-2,537
May 2025-115
April 202524,318
March 202532,450
February 202529,657
January 202531,252
December 202424,595
November 202426,992
October 202425,406
September 202430,412
August 202431,053
July 202431,956
June 202428,900
May 202415,288
April 202425,643
March 202432,462
February 202422,091
January 202430,232

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Albany Green Energy plant?

Albany Green Energy made 0.1% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.1% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 97th largest of 263 plants in Georgia, the 3,652nd largest of 14,327 in the U.S. and the 78th largest of 585 biomass plants. By 2025 generation it is the 81st largest of 242 generating plants in the state.

Albany Green Energy within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)5542,7190.1%
Generation (MWh)106,169144,967,3520.1%
Biomass capacity (MW)558826.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Albany Green Energy plant, and when do they retire?

1 operable generator totals 54.5 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s155100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingWood/Wood Waste Biomass552017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Albany Green Energy plant?

EIA lists no joint owners for Albany Green Energy. Albany Green Energy, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Albany Green Energy plant?

Albany Green Energy is in Albany, Dougherty County, Georgia, at 31.5559° N, 84.1103° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Georgia are similar in size?

Georgia has 23 operable biomass plants with 882 MW of capacity, and Albany Green Energy's 54.5 MW is 6% of that.

Biomass plants in Georgia around this size
PlantCountyMW2025 MWh
Piedmont Green PowerLamar60407,298
GRP Franklin Renewable Energy FacilityFranklin58384,773
GRP Madison Renewable Energy FacilityMadison58423,403
Albany Green EnergyDougherty55106,085
Clearwater Paper Corporation - AugustaRichmond46n/a
WestRock Southeast, LLC.Laurens4582,100

Source: EIA Forms EIA-860 and EIA-923, 2025.