Biomass power plant, Georgia
Jesup Plant, Georgia
Jesup Plant is a 69.5 MW biomass power plant in Wayne County, Georgia, operated by Rayonier Advanced Materials, and it generated 464,377 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Georgia, and its capacity factor sits at the 85th percentile of U.S. biomass plants. By 2025 generation it ranks 1,421st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Jesup Plant run compared with other biomass plants?
Jesup Plant had a capacity factor of 73% in 2025 on 64.7 MW of net summer capacity, the 85th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 268 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Jesup Plant | 73% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Jesup Plant generating more or less than last year?
Generation at Jesup Plant fell 0.4% from 2024 to 2025, from 466,456 MWh to 464,377 MWh.
| Period | MWh |
|---|---|
| 2024 | 466,456 |
| 2025 | 464,377 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 41,479 |
| November 2025 | 40,069 |
| October 2025 | 42,608 |
| September 2025 | 39,512 |
| August 2025 | 39,518 |
| July 2025 | 42,411 |
| June 2025 | 41,202 |
| May 2025 | 41,018 |
| April 2025 | 20,151 |
| March 2025 | 41,574 |
| February 2025 | 37,778 |
| January 2025 | 37,058 |
| December 2024 | 38,070 |
| November 2024 | 41,966 |
| October 2024 | 35,567 |
| September 2024 | 42,775 |
| August 2024 | 42,403 |
| July 2024 | 40,951 |
| June 2024 | 41,735 |
| May 2024 | 41,573 |
| April 2024 | 22,805 |
| March 2024 | 39,292 |
| February 2024 | 38,247 |
| January 2024 | 41,073 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Jesup Plant, and when do they retire?
4 operable generators total 69.5 MW, with an average age of 52 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 12.5 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1950s | 2 | 13 | 18% | none reported |
| 1970s | 1 | 30 | 43% | none reported |
| 1980s | 1 | 27 | 39% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN2 | Operating | Wood/Wood Waste Biomass | 5 | 1954 | n/a |
| GEN4 | Operating | Wood/Wood Waste Biomass | 8 | 1957 | n/a |
| GEN5 | Operating | Wood/Wood Waste Biomass | 30 | 1971 | n/a |
| GEN6 | Operating | Wood/Wood Waste Biomass | 27 | 1982 | n/a |
| GEN1 | Retired | Wood/Wood Waste Biomass | 5 | 1954 | 2000 |
| GEN3 | Retired | Wood/Wood Waste Biomass | 8 | 1957 | 2017 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Jesup Plant?
EIA lists no joint owners for Jesup Plant. Rayonier Advanced Materials operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Jesup Plant?
Jesup Plant is in Jesup, Wayne County, Georgia, at 31.6593° N, 81.8439° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in Georgia are similar in size?
Georgia has 23 operable biomass plants with 882 MW of capacity, and Jesup Plant's 69.5 MW is 8% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Brunswick Cellulose | Glynn | 72 | 157,888 |
| Inland Paperboard Packaging Rome | Floyd | 70 | 366,272 |
| PCA-Valdosta Mill | Lowndes | 70 | 298,618 |
| Jesup Plant | Wayne | 70 | 415,698 |
| Piedmont Green Power | Lamar | 60 | 407,298 |
| GRP Franklin Renewable Energy Facility | Franklin | 58 | 384,773 |
| GRP Madison Renewable Energy Facility | Madison | 58 | 423,403 |
Source: EIA Forms EIA-860 and EIA-923, 2025.