Fort Bend Solar LLC is a 240 MW solar power plant in Fort Bend County, Texas, operated by Acciona Energy USA Global, LLC, and it generated 527,197 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 65th percentile of U.S. solar plants. By 2025 generation it ranks 1,286th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

240 MWNameplate capacity
25%Capacity factor, 2025, 65th percentile, on 240 MW net summer
0.1%Of TX generation, 2025
2 yearsAverage generator age, by MW

How hard does the Fort Bend Solar LLC plant run compared with other solar plants?

The Fort Bend Solar LLC plant had a capacity factor of 25% in 2025 on 240 MW of net summer capacity, the 65th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fort Bend Solar LLC25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fort Bend Solar LLC plant generating more or less than last year?

Generation at Fort Bend Solar LLC rose 22.6% from 2024 to 2025, from 430,043 MWh to 527,197 MWh. Through August 2026 it is running 6.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024430,043
2025527,197
2026 through August384,450
2025, same months361,243
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202661,410
July 202659,119
June 202652,021
May 202652,676
April 202633,682
March 202651,939
February 202640,701
January 202632,902
December 202526,865
November 202537,568
October 202546,778
September 202554,743
August 202553,407
July 202554,357
June 202554,936
May 202555,718
April 202548,553
March 202548,031
February 202524,984
January 202521,257
December 202416,807
November 202421,487
October 202443,196
September 202442,724
August 202448,411
July 202443,398
June 202454,716
May 202440,093
April 202444,215
March 202431,542
February 202420,616
January 202422,838

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Fort Bend Solar LLC plant?

Fort Bend Solar LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 231st largest of 1,023 plants in Texas, the 1,316th largest of 14,327 in the U.S. and the 114th largest of 7,223 solar plants. By 2025 generation it is the 268th largest of 816 generating plants in the state.

Fort Bend Solar LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)240195,9660.1%
Generation (MWh)527,197592,896,1760.1%
Solar capacity (MW)24030,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fort Bend Solar LLC plant, and when do they retire?

1 operable generator totals 240 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1240100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FBSOperatingSolar Photovoltaic2402023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fort Bend Solar LLC plant?

EIA lists no joint owners for Fort Bend Solar LLC. Acciona Energy USA Global, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Fort Bend Solar LLC plant?

Fort Bend Solar LLC is in East Bernard, Fort Bend County, Texas, at 29.5603° N, 95.9804° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Fort Bend Solar LLC's 240 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Roaring Springs, LLCMotley25091,658
Porter Solar, LLC (TX)Denton245556,333
Misae SolarChildress240408,882
Fort Bend Solar LLCFort Bend240527,197
7V Solar RanchFayette240501,270
Eiffel Solar ProjectLamar240573,603
True North Solar, LLCFalls239556,356