Solar power plant, Texas
7V Solar Ranch power plant, Texas
7V Solar Ranch is a 240 MW solar power plant in Fayette County, Texas, operated by 7V Solar Ranch, LLC, and it generated 501,270 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 56th percentile of U.S. solar plants. By 2025 generation it ranks 1,335th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the 7V Solar Ranch plant run compared with other solar plants?
The 7V Solar Ranch plant had a capacity factor of 24% in 2025 on 240 MW of net summer capacity, the 56th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| 7V Solar Ranch | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the 7V Solar Ranch plant generating more or less than last year?
7V Solar Ranch generated 501,270 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 10.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 501,270 |
| 2026 through August | 378,884 |
| 2025, same months | 344,555 |
Monthly generation, Jan 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 61,104 |
| July 2026 | 58,974 |
| June 2026 | 50,595 |
| May 2026 | 53,516 |
| April 2026 | 34,116 |
| March 2026 | 50,378 |
| February 2026 | 37,978 |
| January 2026 | 32,223 |
| December 2025 | 24,287 |
| November 2025 | 33,984 |
| October 2025 | 46,904 |
| September 2025 | 51,540 |
| August 2025 | 50,453 |
| July 2025 | 43,569 |
| June 2025 | 54,356 |
| May 2025 | 56,410 |
| April 2025 | 45,177 |
| March 2025 | 46,740 |
| February 2025 | 25,466 |
| January 2025 | 22,384 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the 7V Solar Ranch plant, and when do they retire?
1 operable generator totals 240 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 240 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 7V1 | Operating | Solar Photovoltaic | 240 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the 7V Solar Ranch plant?
EIA lists no joint owners for 7V Solar Ranch. 7V Solar Ranch, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the 7V Solar Ranch plant?
7V Solar Ranch is in Muldoon, Fayette County, Texas, at 29.8070° N, 97.0741° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and 7V Solar Ranch's 240 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Porter Solar, LLC (TX) | Denton | 245 | 556,333 |
| Misae Solar | Childress | 240 | 408,882 |
| Fort Bend Solar LLC | Fort Bend | 240 | 527,197 |
| 7V Solar Ranch | Fayette | 240 | 501,270 |
| Eiffel Solar Project | Lamar | 240 | 573,603 |
| True North Solar, LLC | Falls | 239 | 556,356 |
| Fence Post Solar Hybrid Project, LLC | Navarro | 236 | 528,457 |
Source: EIA Forms EIA-860 and EIA-923, 2025.