Skip to main content
RateWatt

Solar power plant, Texas

Fence Post Solar Hybrid Project, LLC power plant, Texas

Fence Post Solar Hybrid Project, LLC is a 308 MW power plant, 236 MW of it solar, in Navarro County, Texas, operated by Fence Post Solar Project, LLC, and it generated 523,714 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 69th percentile of U.S. solar plants. By 2025 generation it ranks 1,299th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

308 MWNameplate capacity
26%Capacity factor, 2025, solar units, 69th percentile, on 236 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Fence Post Solar Hybrid Project, LLC plant run compared with other solar plants?

The Fence Post Solar Hybrid Project, LLC plant's solar units had a capacity factor of 26% in 2025 on 236 MW of net summer capacity, the 69th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fence Post Solar Hybrid Project, LLC26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Fence Post Solar Hybrid Project, LLC plant generating more or less than last year?

Fence Post Solar Hybrid Project, LLC generated 523,714 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.7% ahead of the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024156,046
2025523,714
2026 through August373,066
2025, same months370,416
Monthly generation, Sep 2024 to Aug 2026
MonthMWh
August 202666,529
July 202665,451
June 202654,854
May 202648,695
April 202635,437
March 202642,732
February 202630,191
January 202629,177
December 202520,447
November 202534,135
October 202546,083
September 202552,633
August 202556,492
July 202559,007
June 202556,497
May 202549,378
April 202543,977
March 202545,386
February 202529,941
January 202529,738
December 202424,912
November 202431,895
October 202450,157
September 202449,082

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Fence Post Solar Hybrid Project, LLC plant?

Fence Post Solar Hybrid Project, LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 154th largest of 1,023 plants in Texas, the 1,009th largest of 14,327 in the U.S. and the 119th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 274th largest of 816 generating plants in the state.

Fence Post Solar Hybrid Project, LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)308195,9660.2%
Generation (MWh)523,714592,896,1760.1%
Solar capacity (MW)23630,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fence Post Solar Hybrid Project, LLC plant, and when do they retire?

2 operable generators total 308 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2308100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FNCBEOperatingBatteries722024n/a
FNCPTOperatingSolar Photovoltaic2362024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fence Post Solar Hybrid Project, LLC plant?

EIA lists no joint owners for Fence Post Solar Hybrid Project, LLC. Fence Post Solar Project, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Fence Post Solar Hybrid Project, LLC plant use?

Fence Post Solar Hybrid Project, LLC has capacity on 2 fuels: 77% solar and 23% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar23676.6%528,457
Battery and pumped storage7223.4%-4,743

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Fence Post Solar Hybrid Project, LLC plant?

Fence Post Solar Hybrid Project, LLC is in Corsicana, Navarro County, Texas, at 32.0728° N, 96.2239° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Fence Post Solar Hybrid Project, LLC's 236 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
7V Solar RanchFayette240501,270
Eiffel Solar ProjectLamar240573,603
True North Solar, LLCFalls239556,356
Fence Post Solar Hybrid Project, LLCNavarro236528,457
Bernard Creek SolarWharton230500,378
Fighting Jays Solar ProjectFort Bend228454,185
ENGIE Long Draw Solar LLCBorden225519,379

Source: EIA Forms EIA-860 and EIA-923, 2025.