Solar power plant, Texas

Fighting Jays Solar Project, Texas

Fighting Jays Solar Project is a 228 MW solar power plant in Fort Bend County, Texas, operated by AP Solar 2, LLC, and it generated 454,185 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 47th percentile of U.S. solar plants. By 2025 generation it ranks 1,443rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

228 MWNameplate capacity
23%Capacity factor, 2025, 47th percentile, on 228 MW net summer
0.1%Of TX generation, 2025
3 yearsAverage generator age, by MW

How hard does the Fighting Jays Solar Project plant run compared with other solar plants?

The Fighting Jays Solar Project plant had a capacity factor of 23% in 2025 on 228 MW of net summer capacity, the 47th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fighting Jays Solar Project23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fighting Jays Solar Project plant generating more or less than last year?

Generation at Fighting Jays Solar Project rose 60.0% from 2024 to 2025, from 283,823 MWh to 454,185 MWh. Through August 2026 it is running 19.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024283,823
2025454,185
2026 through August339,463
2025, same months283,411
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202659,338
July 202655,229
June 202641,313
May 202623,930
April 202644,184
March 202652,805
February 202633,956
January 202628,708
December 202526,304
November 202537,422
October 202550,025
September 202557,023
August 202555,303
July 202547,345
June 202540,010
May 202532,155
April 202530,660
March 202533,171
February 202527,659
January 202517,108
December 202421,903
November 202414,948
October 202426,174
September 202422,946
August 202425,810
July 202422,285
June 202429,714
May 202419,480
April 202421,711
March 202425,416
February 202430,078
January 202423,358

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Fighting Jays Solar Project plant?

Fighting Jays Solar Project made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 252nd largest of 1,023 plants in Texas, the 1,374th largest of 14,327 in the U.S. and the 123rd largest of 7,223 solar plants. By 2025 generation it is the 297th largest of 816 generating plants in the state.

Fighting Jays Solar Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)228195,9660.1%
Generation (MWh)454,185592,896,1760.1%
Solar capacity (MW)22830,7390.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fighting Jays Solar Project plant, and when do they retire?

1 operable generator totals 228 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1228100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FJSOLOperatingSolar Photovoltaic2282022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fighting Jays Solar Project plant?

EIA lists no joint owners for Fighting Jays Solar Project. AP Solar 2, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Fighting Jays Solar Project plant?

Fighting Jays Solar Project is in Needville, Fort Bend County, Texas, at 29.3584° N, 95.7464° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Fighting Jays Solar Project's 228 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
True North Solar, LLCFalls239556,356
Fence Post Solar Hybrid Project, LLCNavarro236528,457
Bernard Creek SolarWharton230500,378
Fighting Jays Solar ProjectFort Bend228454,185
ENGIE Long Draw Solar LLCBorden225519,379
Azure Sky SolarHaskell225544,713
Diver Solar, LLCLimestone225177,335

Source: EIA Forms EIA-860 and EIA-923, 2025.