Solar power plant, Texas
Diver Solar, LLC power plant, Texas
Diver Solar, LLC is a 225 MW solar power plant in Limestone County, Texas, operated by Diver Solar, LLC, and it generated 177,335 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 7th percentile of U.S. solar plants. By 2025 generation it ranks 2,674th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Diver Solar, LLC plant run compared with other solar plants?
The Diver Solar, LLC plant had a capacity factor of 9% in 2025 on 225 MW of net summer capacity, the 7th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 33 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Diver Solar, LLC | 9% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Diver Solar, LLC plant generating more or less than last year?
Diver Solar, LLC generated 177,335 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1644.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 177,335 |
| 2026 through August | 368,061 |
| 2025, same months | 21,105 |
Monthly generation, Aug 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 53,411 |
| July 2026 | 60,675 |
| June 2026 | 51,024 |
| May 2026 | 47,288 |
| April 2026 | 35,031 |
| March 2026 | 48,429 |
| February 2026 | 39,881 |
| January 2026 | 32,322 |
| December 2025 | 26,074 |
| November 2025 | 34,853 |
| October 2025 | 45,063 |
| September 2025 | 50,240 |
| August 2025 | 21,105 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Diver Solar, LLC plant, and when do they retire?
1 operable generator totals 225 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 225 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 5665 | Operating | Solar Photovoltaic | 225 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Diver Solar, LLC plant?
EIA lists no joint owners for Diver Solar, LLC. Diver Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Diver Solar, LLC plant?
Diver Solar, LLC is in Thornton, Limestone County, Texas, at 31.2500° N, 96.3900° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Diver Solar, LLC's 225 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Fighting Jays Solar Project | Fort Bend | 228 | 454,185 |
| ENGIE Long Draw Solar LLC | Borden | 225 | 519,379 |
| Azure Sky Solar | Haskell | 225 | 544,713 |
| Diver Solar, LLC | Limestone | 225 | 177,335 |
| Stillhouse Solar | Bell | 210 | 53,807 |
| Estonian Solar Project, LLC | Delta | 205 | 438,284 |
| Taygete II Energy Project | Pecos | 204 | 455,787 |
Source: EIA Forms EIA-860 and EIA-923, 2025.