Skip to main content
RateWatt

Solar power plant, Texas

Taygete II Energy Project, Texas

Taygete II Energy Project is a 204 MW solar power plant in Pecos County, Texas, operated by West Texas Solar Project II LLC, and it generated 455,787 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 69th percentile of U.S. solar plants. By 2025 generation it ranks 1,437th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

204 MWNameplate capacity
26%Capacity factor, 2025, 69th percentile, on 204 MW net summer
0.1%Of TX generation, 2025
2 yearsAverage generator age, by MW

How hard does the Taygete II Energy Project plant run compared with other solar plants?

The Taygete II Energy Project plant had a capacity factor of 26% in 2025 on 204 MW of net summer capacity, the 69th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Taygete II Energy Project26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Taygete II Energy Project plant generating more or less than last year?

Generation at Taygete II Energy Project fell 9.4% from 2024 to 2025, from 503,002 MWh to 455,787 MWh. Through August 2026 it is running 2.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024503,002
2025455,787
2026 through August314,762
2025, same months307,412
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202654,745
July 202652,050
June 202634,590
May 202643,414
April 202639,761
March 202635,647
February 202628,901
January 202625,654
December 202527,903
November 202534,139
October 202542,199
September 202544,134
August 202552,509
July 202554,085
June 202546,082
May 202545,236
April 202533,593
March 202522,553
February 202526,973
January 202526,381
December 202429,810
November 202432,024
October 202443,285
September 202441,677
August 202454,918
July 202449,968
June 202450,535
May 202455,950
April 202441,704
March 202438,996
February 202433,911
January 202430,224

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Taygete II Energy Project plant?

Taygete II Energy Project made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 279th largest of 1,023 plants in Texas, the 1,471st largest of 14,327 in the U.S. and the 136th largest of 7,223 solar plants. By 2025 generation it is the 295th largest of 816 generating plants in the state.

Taygete II Energy Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)204195,9660.1%
Generation (MWh)455,787592,896,1760.1%
Solar capacity (MW)20430,7390.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Taygete II Energy Project plant, and when do they retire?

1 operable generator totals 204 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1204100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TAYG2OperatingSolar Photovoltaic2042023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Taygete II Energy Project plant?

EIA lists no joint owners for Taygete II Energy Project. West Texas Solar Project II LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Taygete II Energy Project plant?

Taygete II Energy Project is in Coyanosa, Pecos County, Texas, at 31.1860° N, 103.1280° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Taygete II Energy Project's 204 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Diver Solar, LLCLimestone225177,335
Stillhouse SolarBell21053,807
Estonian Solar Project, LLCDelta205438,284
Taygete II Energy ProjectPecos204455,787
AP Sunray LLCUvalde204429,906
Cutlass Solar IIFort Bend203417,759
Holstein 1 Solar FarmNolan200255,203

Source: EIA Forms EIA-860 and EIA-923, 2025.