Holstein 1 Solar Farm, Texas

Holstein 1 Solar Farm is a 200 MW solar power plant in Nolan County, Texas, operated by Holstein Solar Farm 1, LLC, and it generated 255,203 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 11th percentile of U.S. solar plants. By 2025 generation it ranks 2,196th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
15%Capacity factor, 2025, 11th percentile, on 200 MW net summer
2,196thU.S. rank by generation, 2025
5 yearsAverage generator age, by MW

How hard does the Holstein 1 Solar Farm plant run compared with other solar plants?

The Holstein 1 Solar Farm plant had a capacity factor of 15% in 2025 on 200 MW of net summer capacity, the 11th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 53 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Holstein 1 Solar Farm15%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Holstein 1 Solar Farm plant generating more or less than last year?

Generation at Holstein 1 Solar Farm fell 33.2% from 2024 to 2025, from 382,062 MWh to 255,203 MWh. Through August 2026 it is running 130.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024382,062
2025255,203
2026 through August336,060
2025, same months145,637
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202654,733
July 202653,779
June 202646,514
May 202635,082
April 202636,652
March 202645,128
February 202635,679
January 202628,493
December 202527,085
November 202527,162
October 202527,363
September 202527,956
August 202510,774
July 202518,997
June 202517,204
May 202527,391
April 202516,798
March 202517,152
February 202519,767
January 202517,554
December 202417,250
November 202421,211
October 202431,693
September 202438,699
August 202448,551
July 202447,664
June 202444,142
May 202434,751
April 202423,872
March 202431,557
February 202423,646
January 202419,026

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Holstein 1 Solar Farm plant?

Holstein 1 Solar Farm made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 302nd largest of 1,023 plants in Texas, the 1,524th largest of 14,327 in the U.S. and the 142nd largest of 7,223 solar plants. By 2025 generation it is the 418th largest of 816 generating plants in the state.

Holstein 1 Solar Farm within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)255,203592,896,1760.0%
Solar capacity (MW)20030,7390.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Holstein 1 Solar Farm plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HSF01OperatingSolar Photovoltaic2002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Holstein 1 Solar Farm plant?

226HC 8me, LLC is the only joint owner reported for Holstein 1 Solar Farm, with 100.0%. Holstein Solar Farm 1, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Holstein 1 Solar Farm plant?

Holstein 1 Solar Farm is in Wingate, Nolan County, Texas, at 32.1041° N, 100.1624° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Holstein 1 Solar Farm's 200 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Taygete II Energy ProjectPecos204455,787
AP Sunray LLCUvalde204429,906
Cutlass Solar IIFort Bend203417,759
Holstein 1 Solar FarmNolan200255,203
RamblerTom Green200376,921
Samson Solar Energy II LLCLamar200353,525
ANSON Solar Center, LLCJones200503,715