Solar power plant, Texas

AP Sunray LLC solar power plant, Texas

AP Sunray LLC is a 204 MW solar power plant in Uvalde County, Texas, operated by AP Sunray LLC, and it generated 429,906 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 58th percentile of U.S. solar plants. By 2025 generation it ranks 1,508th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

204 MWNameplate capacity
24%Capacity factor, 2025, 58th percentile, on 204 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the AP Sunray LLC plant run compared with other solar plants?

The AP Sunray LLC plant had a capacity factor of 24% in 2025 on 204 MW of net summer capacity, the 58th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
AP Sunray LLC24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the AP Sunray LLC plant generating more or less than last year?

AP Sunray LLC generated 429,906 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.7% behind the same months of 2025. 2024 has output for only 5 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024152,093
2025429,906
2026 through August286,549
2025, same months297,522
Monthly generation, Aug 2024 to Aug 2026
MonthMWh
August 202657,237
July 202647,136
June 202645,676
May 202643,709
April 202630,367
March 202615,097
February 202624,160
January 202623,167
December 202524,515
November 202527,796
October 202536,367
September 202543,706
August 202555,057
July 202544,569
June 202540,742
May 202548,862
April 202538,091
March 202526,444
February 202522,867
January 202520,890
December 202419,581
November 202428,462
October 202441,169
September 202444,742
August 202418,139

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the AP Sunray LLC plant?

AP Sunray LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 280th largest of 1,023 plants in Texas, the 1,472nd largest of 14,327 in the U.S. and the 137th largest of 7,223 solar plants. By 2025 generation it is the 311th largest of 816 generating plants in the state.

AP Sunray LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)204195,9660.1%
Generation (MWh)429,906592,896,1760.1%
Solar capacity (MW)20430,7390.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the AP Sunray LLC plant, and when do they retire?

1 operable generator totals 204 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1204100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OCISROperatingSolar Photovoltaic2042024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the AP Sunray LLC plant?

EIA lists no joint owners for AP Sunray LLC. AP Sunray LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the AP Sunray LLC plant?

AP Sunray LLC is in Knippa, Uvalde County, Texas, at 29.2918° N, 99.6124° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and AP Sunray LLC's 204 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Stillhouse SolarBell21053,807
Estonian Solar Project, LLCDelta205438,284
Taygete II Energy ProjectPecos204455,787
AP Sunray LLCUvalde204429,906
Cutlass Solar IIFort Bend203417,759
Holstein 1 Solar FarmNolan200255,203
RamblerTom Green200376,921

Source: EIA Forms EIA-860 and EIA-923, 2025.