Solar power plant, Texas
AP Sunray LLC solar power plant, Texas
AP Sunray LLC is a 204 MW solar power plant in Uvalde County, Texas, operated by AP Sunray LLC, and it generated 429,906 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 58th percentile of U.S. solar plants. By 2025 generation it ranks 1,508th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the AP Sunray LLC plant run compared with other solar plants?
The AP Sunray LLC plant had a capacity factor of 24% in 2025 on 204 MW of net summer capacity, the 58th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| AP Sunray LLC | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the AP Sunray LLC plant generating more or less than last year?
AP Sunray LLC generated 429,906 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.7% behind the same months of 2025. 2024 has output for only 5 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 152,093 |
| 2025 | 429,906 |
| 2026 through August | 286,549 |
| 2025, same months | 297,522 |
Monthly generation, Aug 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 57,237 |
| July 2026 | 47,136 |
| June 2026 | 45,676 |
| May 2026 | 43,709 |
| April 2026 | 30,367 |
| March 2026 | 15,097 |
| February 2026 | 24,160 |
| January 2026 | 23,167 |
| December 2025 | 24,515 |
| November 2025 | 27,796 |
| October 2025 | 36,367 |
| September 2025 | 43,706 |
| August 2025 | 55,057 |
| July 2025 | 44,569 |
| June 2025 | 40,742 |
| May 2025 | 48,862 |
| April 2025 | 38,091 |
| March 2025 | 26,444 |
| February 2025 | 22,867 |
| January 2025 | 20,890 |
| December 2024 | 19,581 |
| November 2024 | 28,462 |
| October 2024 | 41,169 |
| September 2024 | 44,742 |
| August 2024 | 18,139 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the AP Sunray LLC plant, and when do they retire?
1 operable generator totals 204 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 204 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| OCISR | Operating | Solar Photovoltaic | 204 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the AP Sunray LLC plant?
EIA lists no joint owners for AP Sunray LLC. AP Sunray LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the AP Sunray LLC plant?
AP Sunray LLC is in Knippa, Uvalde County, Texas, at 29.2918° N, 99.6124° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and AP Sunray LLC's 204 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Stillhouse Solar | Bell | 210 | 53,807 |
| Estonian Solar Project, LLC | Delta | 205 | 438,284 |
| Taygete II Energy Project | Pecos | 204 | 455,787 |
| AP Sunray LLC | Uvalde | 204 | 429,906 |
| Cutlass Solar II | Fort Bend | 203 | 417,759 |
| Holstein 1 Solar Farm | Nolan | 200 | 255,203 |
| Rambler | Tom Green | 200 | 376,921 |