Estonian Solar Project, LLC is a 305 MW power plant, 205 MW of it solar, in Delta County, Texas, operated by Enel Green Power Estonian Solar Project, LLC, and it generated 429,562 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,509th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Estonian Solar Project, LLC plant run compared with other solar plants?
The Estonian Solar Project, LLC plant's solar units had a capacity factor of 24% in 2025 on 205 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Estonian Solar Project, LLC | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Estonian Solar Project, LLC plant generating more or less than last year?
Estonian Solar Project, LLC generated 429,562 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 12.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 429,562 |
| 2026 through August | 331,481 |
| 2025, same months | 294,809 |
Monthly generation, Jan 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 55,162 |
| July 2026 | 54,864 |
| June 2026 | 42,529 |
| May 2026 | 44,208 |
| April 2026 | 33,289 |
| March 2026 | 41,719 |
| February 2026 | 32,759 |
| January 2026 | 26,951 |
| December 2025 | 21,045 |
| November 2025 | 29,593 |
| October 2025 | 39,698 |
| September 2025 | 44,417 |
| August 2025 | 45,627 |
| July 2025 | 54,113 |
| June 2025 | 48,703 |
| May 2025 | 43,558 |
| April 2025 | 35,725 |
| March 2025 | 40,158 |
| February 2025 | 26,925 |
| January 2025 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Estonian Solar Project, LLC plant, and when do they retire?
2 operable generators total 305 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 305 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BESS | Operating | Batteries | 100 | 2025 | n/a |
| SOLAR | Operating | Solar Photovoltaic | 205 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Estonian Solar Project, LLC plant?
EIA lists no joint owners for Estonian Solar Project, LLC. Enel Green Power Estonian Solar Project, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Estonian Solar Project, LLC plant use?
Estonian Solar Project, LLC has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 102% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 205 | 67.2% | 438,284 |
| Battery and pumped storage | 100 | 32.8% | -8,722 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Estonian Solar Project, LLC plant?
Estonian Solar Project, LLC is in Cooper, Delta County, Texas, at 33.4571° N, 95.6679° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Estonian Solar Project, LLC's 205 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Azure Sky Solar | Haskell | 225 | 544,713 |
| Diver Solar, LLC | Limestone | 225 | 177,335 |
| Stillhouse Solar | Bell | 210 | 53,807 |
| Estonian Solar Project, LLC | Delta | 205 | 438,284 |
| Taygete II Energy Project | Pecos | 204 | 455,787 |
| AP Sunray LLC | Uvalde | 204 | 429,906 |
| Cutlass Solar II | Fort Bend | 203 | 417,759 |
Source: EIA Forms EIA-860 and EIA-923, 2025.