Solar power plant, Texas

Cutlass Solar II power plant, Texas

Cutlass Solar II is a 203 MW solar power plant in Fort Bend County, Texas, operated by Cutlass II Solar LLC, and it generated 417,759 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 56th percentile of U.S. solar plants. By 2025 generation it ranks 1,539th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

203 MWNameplate capacity
24%Capacity factor, 2025, 56th percentile, on 200 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Cutlass Solar II plant run compared with other solar plants?

The Cutlass Solar II plant had a capacity factor of 24% in 2025 on 200 MW of net summer capacity, the 56th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cutlass Solar II24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cutlass Solar II plant generating more or less than last year?

Cutlass Solar II generated 417,759 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 11.1% ahead of the same months of 2025. 2024 has output for only 6 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024208,340
2025417,759
2026 through August307,922
2025, same months277,267
Monthly generation, Jul 2024 to Aug 2026
MonthMWh
August 202646,042
July 202646,384
June 202641,639
May 202640,650
April 202630,979
March 202641,935
February 202633,395
January 202626,898
December 202523,454
November 202531,901
October 202540,294
September 202544,843
August 202542,002
July 202543,804
June 202543,896
May 202529,410
April 202537,019
March 202540,160
February 202520,531
January 202520,445
December 202422,954
November 202426,641
October 202440,233
September 202436,706
August 202445,061
July 202436,745

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Cutlass Solar II plant?

Cutlass Solar II made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 284th largest of 1,023 plants in Texas, the 1,478th largest of 14,327 in the U.S. and the 138th largest of 7,223 solar plants. By 2025 generation it is the 319th largest of 816 generating plants in the state.

Cutlass Solar II within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)203195,9660.1%
Generation (MWh)417,759592,896,1760.1%
Solar capacity (MW)20330,7390.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cutlass Solar II plant, and when do they retire?

1 operable generator totals 203 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1203100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SARENOperatingSolar Photovoltaic2032024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cutlass Solar II plant?

EIA lists no joint owners for Cutlass Solar II. Cutlass II Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Cutlass Solar II plant?

Cutlass Solar II is in Richmond, Fort Bend County, Texas, at 29.3900° N, 95.7800° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Cutlass Solar II's 203 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Estonian Solar Project, LLCDelta205438,284
Taygete II Energy ProjectPecos204455,787
AP Sunray LLCUvalde204429,906
Cutlass Solar IIFort Bend203417,759
Holstein 1 Solar FarmNolan200255,203
RamblerTom Green200376,921
Samson Solar Energy II LLCLamar200353,525

Source: EIA Forms EIA-860 and EIA-923, 2025.