Cutlass Solar II is a 203 MW solar power plant in Fort Bend County, Texas, operated by Cutlass II Solar LLC, and it generated 417,759 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 56th percentile of U.S. solar plants. By 2025 generation it ranks 1,539th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cutlass Solar II plant run compared with other solar plants?
The Cutlass Solar II plant had a capacity factor of 24% in 2025 on 200 MW of net summer capacity, the 56th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cutlass Solar II | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Cutlass Solar II plant generating more or less than last year?
Cutlass Solar II generated 417,759 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 11.1% ahead of the same months of 2025. 2024 has output for only 6 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 208,340 |
| 2025 | 417,759 |
| 2026 through August | 307,922 |
| 2025, same months | 277,267 |
Monthly generation, Jul 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 46,042 |
| July 2026 | 46,384 |
| June 2026 | 41,639 |
| May 2026 | 40,650 |
| April 2026 | 30,979 |
| March 2026 | 41,935 |
| February 2026 | 33,395 |
| January 2026 | 26,898 |
| December 2025 | 23,454 |
| November 2025 | 31,901 |
| October 2025 | 40,294 |
| September 2025 | 44,843 |
| August 2025 | 42,002 |
| July 2025 | 43,804 |
| June 2025 | 43,896 |
| May 2025 | 29,410 |
| April 2025 | 37,019 |
| March 2025 | 40,160 |
| February 2025 | 20,531 |
| January 2025 | 20,445 |
| December 2024 | 22,954 |
| November 2024 | 26,641 |
| October 2024 | 40,233 |
| September 2024 | 36,706 |
| August 2024 | 45,061 |
| July 2024 | 36,745 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cutlass Solar II plant, and when do they retire?
1 operable generator totals 203 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 203 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SAREN | Operating | Solar Photovoltaic | 203 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cutlass Solar II plant?
EIA lists no joint owners for Cutlass Solar II. Cutlass II Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Cutlass Solar II plant?
Cutlass Solar II is in Richmond, Fort Bend County, Texas, at 29.3900° N, 95.7800° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Cutlass Solar II's 203 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Estonian Solar Project, LLC | Delta | 205 | 438,284 |
| Taygete II Energy Project | Pecos | 204 | 455,787 |
| AP Sunray LLC | Uvalde | 204 | 429,906 |
| Cutlass Solar II | Fort Bend | 203 | 417,759 |
| Holstein 1 Solar Farm | Nolan | 200 | 255,203 |
| Rambler | Tom Green | 200 | 376,921 |
| Samson Solar Energy II LLC | Lamar | 200 | 353,525 |
Source: EIA Forms EIA-860 and EIA-923, 2025.