Solar power plant, Texas
Rambler solar power plant, Texas
Rambler is a 200 MW solar power plant in Tom Green County, Texas, operated by Deriva Energy, and it generated 376,921 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 38th percentile of U.S. solar plants. By 2025 generation it ranks 1,666th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Rambler plant run compared with other solar plants?
The Rambler plant had a capacity factor of 22% in 2025 on 200 MW of net summer capacity, the 38th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 79 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Rambler | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Rambler plant generating more or less than last year?
Generation at Rambler fell 14.3% from 2024 to 2025, from 439,864 MWh to 376,921 MWh. Through August 2026 it is running 6.9% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 439,864 |
| 2025 | 376,921 |
| 2026 through August | 237,839 |
| 2025, same months | 255,356 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 38,820 |
| July 2026 | 44,522 |
| June 2026 | 35,573 |
| May 2026 | 26,011 |
| April 2026 | 24,687 |
| March 2026 | 21,325 |
| February 2026 | 25,787 |
| January 2026 | 21,114 |
| December 2025 | 25,101 |
| November 2025 | 22,948 |
| October 2025 | 30,049 |
| September 2025 | 43,467 |
| August 2025 | 40,803 |
| July 2025 | 34,531 |
| June 2025 | 52,843 |
| May 2025 | 31,985 |
| April 2025 | 15,563 |
| March 2025 | 30,151 |
| February 2025 | 25,825 |
| January 2025 | 23,655 |
| December 2024 | 21,710 |
| November 2024 | 27,381 |
| October 2024 | 37,002 |
| September 2024 | 42,192 |
| August 2024 | 54,471 |
| July 2024 | 52,807 |
| June 2024 | 49,008 |
| May 2024 | 41,352 |
| April 2024 | 29,318 |
| March 2024 | 34,649 |
| February 2024 | 27,307 |
| January 2024 | 22,667 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Rambler plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RMBLR | Operating | Solar Photovoltaic | 200 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Rambler plant?
RE Rambler, LLC is the only joint owner reported for Rambler, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Rambler plant?
Rambler is in San Angelo, Tom Green County, Texas, at 31.5170° N, 100.6000° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Rambler's 200 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| AP Sunray LLC | Uvalde | 204 | 429,906 |
| Cutlass Solar II | Fort Bend | 203 | 417,759 |
| Holstein 1 Solar Farm | Nolan | 200 | 255,203 |
| Rambler | Tom Green | 200 | 376,921 |
| Samson Solar Energy II LLC | Lamar | 200 | 353,525 |
| ANSON Solar Center, LLC | Jones | 200 | 503,715 |
| Big Star Solar, LLC (Hybrid) | Bastrop | 200 | 376,255 |
Source: EIA Forms EIA-860 and EIA-923, 2025.