Wind power plant, North Dakota

FPL Energy Burleigh County Wind power plant, North Dakota

FPL Energy Burleigh County Wind is a 49.5 MW wind power plant in Burleigh County, North Dakota, operated by FPL Energy Burleigh County Wind LLC, and it generated 186,356 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in North Dakota, and its capacity factor sits at the 85th percentile of U.S. wind plants. By 2025 generation it ranks 2,591st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

49.5 MWNameplate capacity
43%Capacity factor, 2025, 85th percentile, on 49.5 MW net summer
0.4%Of ND generation, 2025
20 yearsAverage generator age, by MW

How hard does the FPL Energy Burleigh County Wind plant run compared with other wind plants?

The FPL Energy Burleigh County Wind plant had a capacity factor of 43% in 2025 on 49.5 MW of net summer capacity, the 85th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 157 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
FPL Energy Burleigh County Wind43%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the FPL Energy Burleigh County Wind plant generating more or less than last year?

Generation at FPL Energy Burleigh County Wind fell 1.8% from 2024 to 2025, from 189,725 MWh to 186,356 MWh.

Net generation by period
PeriodMWh
2024189,725
2025186,356
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202516,330
November 202516,188
October 202521,218
September 202512,571
August 202512,280
July 202510,709
June 202516,860
May 202511,571
April 202516,867
March 202514,273
February 202515,895
January 202521,594
December 202417,273
November 202415,762
October 202415,649
September 202417,860
August 202414,577
July 20249,698
June 202416,121
May 202415,942
April 202421,037
March 202416,483
February 202414,345
January 202414,978

Source: EIA Form EIA-923, through August 2026.

How much of North Dakota's electricity comes from the FPL Energy Burleigh County Wind plant?

FPL Energy Burleigh County Wind made 0.4% of the 42,873,330 MWh reported by North Dakota plants in 2025, from 0.5% of the state's 10,973 MW of capacity. By capacity it is the 42nd largest of 62 plants in North Dakota, the 3,859th largest of 14,327 in the U.S. and the 887th largest of 1,358 wind plants. By 2025 generation it is the 38th largest of 57 generating plants in the state.

FPL Energy Burleigh County Wind within North Dakota, 2025
MeasureThis plantNorth DakotaShare
Capacity (MW)5010,9730.5%
Generation (MWh)186,35642,873,3300.4%
Wind capacity (MW)504,7291.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the FPL Energy Burleigh County Wind plant, and when do they retire?

2 operable generators total 49.5 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s250100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GE15OperatingOnshore Wind Turbine322005n/a
GEOperatingOnshore Wind Turbine182006n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the FPL Energy Burleigh County Wind plant?

EIA lists no joint owners for FPL Energy Burleigh County Wind. FPL Energy Burleigh County Wind LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the FPL Energy Burleigh County Wind plant?

FPL Energy Burleigh County Wind is in Wilton, Burleigh County, North Dakota, at 47.1167° N, 100.7333° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in North Dakota are similar in size?

North Dakota has 41 operable wind plants with 4,729 MW of capacity, and FPL Energy Burleigh County Wind's 49.5 MW is 1% of that.

Wind plants in North Dakota around this size
PlantCountyMW2025 MWh
Ashtabula Wind III LLCBarnes62119,861
FPL Energy North Dakota Wind I/IILaMoure62120,784
FPL Energy Oliver Wind I LLCOliver51181,632
FPL Energy Burleigh County WindBurleigh50186,356
Luverne Wind Energy CenterSteele50151,405
Wilton Wind II LLCBurleigh50201,068
FPL Energy Oliver Wind II LLCOliver48189,468

Source: EIA Forms EIA-860 and EIA-923, 2025.