Wind power plant, North Dakota

FPL Energy Oliver Wind II LLC power plant, North Dakota

FPL Energy Oliver Wind II LLC is a 48 MW wind power plant in Oliver County, North Dakota, operated by FPL Energy Oliver County Wind II LLC, and it generated 189,468 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in North Dakota, and its capacity factor sits at the 91st percentile of U.S. wind plants. By 2025 generation it ranks 2,565th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

48 MWNameplate capacity
45%Capacity factor, 2025, 91st percentile, on 48 MW net summer
0.4%Of ND generation, 2025
18 yearsAverage generator age, by MW

How hard does the FPL Energy Oliver Wind II LLC plant run compared with other wind plants?

The FPL Energy Oliver Wind II LLC plant had a capacity factor of 45% in 2025 on 48 MW of net summer capacity, the 91st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 164 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
FPL Energy Oliver Wind II LLC45%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the FPL Energy Oliver Wind II LLC plant generating more or less than last year?

Generation at FPL Energy Oliver Wind II LLC rose 4.7% from 2024 to 2025, from 180,941 MWh to 189,468 MWh.

Net generation by period
PeriodMWh
2024180,941
2025189,468
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202519,283
November 202516,750
October 202520,191
September 202512,248
August 202512,885
July 202511,381
June 202510,513
May 202515,387
April 202516,954
March 202516,183
February 202515,480
January 202522,213
December 202418,350
November 202414,818
October 202414,628
September 202416,776
August 202416,027
July 202410,845
June 202411,360
May 202415,014
April 202418,452
March 202415,307
February 202414,353
January 202415,011

Source: EIA Form EIA-923, through August 2026.

How much of North Dakota's electricity comes from the FPL Energy Oliver Wind II LLC plant?

FPL Energy Oliver Wind II LLC made 0.4% of the 42,873,330 MWh reported by North Dakota plants in 2025, from 0.4% of the state's 10,973 MW of capacity. By capacity it is the 46th largest of 62 plants in North Dakota, the 3,894th largest of 14,327 in the U.S. and the 893rd largest of 1,358 wind plants. By 2025 generation it is the 37th largest of 57 generating plants in the state.

FPL Energy Oliver Wind II LLC within North Dakota, 2025
MeasureThis plantNorth DakotaShare
Capacity (MW)4810,9730.4%
Generation (MWh)189,46842,873,3300.4%
Wind capacity (MW)484,7291.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the FPL Energy Oliver Wind II LLC plant, and when do they retire?

1 operable generator totals 48 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s148100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2OperatingOnshore Wind Turbine482007n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the FPL Energy Oliver Wind II LLC plant?

EIA lists no joint owners for FPL Energy Oliver Wind II LLC. FPL Energy Oliver County Wind II LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the FPL Energy Oliver Wind II LLC plant?

FPL Energy Oliver Wind II LLC is in Center, Oliver County, North Dakota, at 47.1528° N, 101.1977° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in North Dakota are similar in size?

North Dakota has 41 operable wind plants with 4,729 MW of capacity, and FPL Energy Oliver Wind II LLC's 48 MW is 1% of that.

Wind plants in North Dakota around this size
PlantCountyMW2025 MWh
FPL Energy Burleigh County WindBurleigh50186,356
Luverne Wind Energy CenterSteele50151,405
Wilton Wind II LLCBurleigh50201,068
FPL Energy Oliver Wind II LLCOliver48189,468
Ashtabula Wind Energy CenterBarnes4888,584
Langdon Wind II LLCCavalier41174,779
Langdon Wind Energy CenterCavalier41172,665

Source: EIA Forms EIA-860 and EIA-923, 2025.