Wind power plant, North Dakota
Langdon Wind II LLC power plant, North Dakota
Langdon Wind II LLC is a 40.5 MW wind power plant in Cavalier County, North Dakota, operated by FPL Energy Langdon Wind LLC, and it generated 174,779 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in North Dakota, and its capacity factor sits at the 98th percentile of U.S. wind plants. By 2025 generation it ranks 2,684th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Langdon Wind II LLC plant run compared with other wind plants?
The Langdon Wind II LLC plant had a capacity factor of 49% in 2025 on 40.5 MW of net summer capacity, the 98th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 180 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Langdon Wind II LLC | 49% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Langdon Wind II LLC plant generating more or less than last year?
Generation at Langdon Wind II LLC rose 2.2% from 2024 to 2025, from 170,937 MWh to 174,779 MWh.
| Period | MWh |
|---|---|
| 2024 | 170,937 |
| 2025 | 174,779 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 15,215 |
| November 2025 | 16,606 |
| October 2025 | 17,591 |
| September 2025 | 12,271 |
| August 2025 | 11,153 |
| July 2025 | 9,165 |
| June 2025 | 12,176 |
| May 2025 | 15,913 |
| April 2025 | 14,775 |
| March 2025 | 14,120 |
| February 2025 | 16,654 |
| January 2025 | 19,140 |
| December 2024 | 15,451 |
| November 2024 | 15,212 |
| October 2024 | 16,315 |
| September 2024 | 15,635 |
| August 2024 | 11,874 |
| July 2024 | 7,926 |
| June 2024 | 15,275 |
| May 2024 | 14,948 |
| April 2024 | 17,717 |
| March 2024 | 14,042 |
| February 2024 | 13,234 |
| January 2024 | 13,308 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Langdon Wind II LLC plant, and when do they retire?
1 operable generator totals 40.5 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 41 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GE15 | Operating | Onshore Wind Turbine | 41 | 2008 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Langdon Wind II LLC plant?
EIA lists no joint owners for Langdon Wind II LLC. FPL Energy Langdon Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Langdon Wind II LLC plant?
Langdon Wind II LLC is in Osnabrock, Cavalier County, North Dakota, at 48.6292° N, 98.3164° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in North Dakota are similar in size?
North Dakota has 41 operable wind plants with 4,729 MW of capacity, and Langdon Wind II LLC's 40.5 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Wilton Wind II LLC | Burleigh | 50 | 201,068 |
| FPL Energy Oliver Wind II LLC | Oliver | 48 | 189,468 |
| Ashtabula Wind Energy Center | Barnes | 48 | 88,584 |
| Langdon Wind II LLC | Cavalier | 41 | 174,779 |
| Langdon Wind Energy Center | Cavalier | 41 | 172,665 |
Source: EIA Forms EIA-860 and EIA-923, 2025.