Wind power plant, Oklahoma

Frontier Windpower wind power plant, Oklahoma

Frontier Windpower is a 200 MW wind power plant in Kay County, Oklahoma, operated by Deriva Energy, and it generated 484,545 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Oklahoma, and its capacity factor sits at the 31st percentile of U.S. wind plants. By 2025 generation it ranks 1,369th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
28%Capacity factor, 2025, 31st percentile, on 200 MW net summer
0.5%Of OK generation, 2025
9 yearsAverage generator age, by MW

How hard does the Frontier Windpower plant run compared with other wind plants?

The Frontier Windpower plant had a capacity factor of 28% in 2025 on 200 MW of net summer capacity, the 31st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 101 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Frontier Windpower28%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Frontier Windpower plant generating more or less than last year?

Generation at Frontier Windpower fell 10.5% from 2024 to 2025, from 541,624 MWh to 484,545 MWh. Through August 2026 it is running 12.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024541,624
2025484,545
2026 through August391,663
2025, same months349,001
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202642,063
July 202629,609
June 202647,392
May 202648,580
April 202660,847
March 202666,564
February 202646,522
January 202650,086
December 202553,030
November 202543,218
October 202525,390
September 202513,906
August 202533,840
July 202538,736
June 202522,571
May 202521,195
April 202560,950
March 202579,135
February 202546,522
January 202546,052
December 202449,369
November 202449,470
October 202456,987
September 202427,210
August 202436,807
July 202435,024
June 202440,483
May 202430,838
April 202458,747
March 202459,548
February 202456,414
January 202440,727

Source: EIA Form EIA-923, through August 2026.

How much of Oklahoma's electricity comes from the Frontier Windpower plant?

Frontier Windpower made 0.5% of the 89,758,877 MWh reported by Oklahoma plants in 2025, from 0.6% of the state's 35,828 MW of capacity. By capacity it is the 49th largest of 143 plants in Oklahoma, the 1,524th largest of 14,327 in the U.S. and the 300th largest of 1,358 wind plants. By 2025 generation it is the 49th largest of 135 generating plants in the state.

Frontier Windpower within Oklahoma, 2025
MeasureThis plantOklahomaShare
Capacity (MW)20035,8280.6%
Generation (MWh)484,54589,758,8770.5%
Wind capacity (MW)20013,3441.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Frontier Windpower plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FC1OperatingOnshore Wind Turbine2002016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Frontier Windpower plant?

Frontier Windpower, LLC is the only joint owner reported for Frontier Windpower, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Frontier Windpower plant?

Frontier Windpower is in Newkirk, Kay County, Oklahoma, at 36.8389° N, 97.1810° W. It sits in the Southwestern Power Administration balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oklahoma are similar in size?

Oklahoma has 69 operable wind plants with 13,344 MW of capacity, and Frontier Windpower's 200 MW is 1% of that.

Wind plants in Oklahoma around this size
PlantCountyMW2025 MWh
Horizon Hill Wind ProjectLogan202624,315
White Rock East Wind ProjectCaddo202682,951
Goodwell Wind Project LLCTexas200701,006
Frontier WindpowerKay200484,545
Ponderosa Wind Energy CenterBeaver200911,051
Seiling Wind IDewey199454,051
Sundance Wind Project, LLCWoods199566,237

Source: EIA Forms EIA-860 and EIA-923, 2025.