Wind power plant, Oklahoma

Sundance Wind Project, LLC power plant, Oklahoma

Sundance Wind Project, LLC is a 199 MW wind power plant in Woods County, Oklahoma, operated by Public Service Co of Oklahoma, and it generated 566,237 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Oklahoma, and its capacity factor sits at the 49th percentile of U.S. wind plants. By 2025 generation it ranks 1,195th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

199 MWNameplate capacity
32%Capacity factor, 2025, 49th percentile, on 199 MW net summer
0.6%Of OK generation, 2025
4 yearsAverage generator age, by MW

How hard does the Sundance Wind Project, LLC plant run compared with other wind plants?

The Sundance Wind Project, LLC plant had a capacity factor of 32% in 2025 on 199 MW of net summer capacity, the 49th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 119 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sundance Wind Project, LLC32%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sundance Wind Project, LLC plant generating more or less than last year?

Generation at Sundance Wind Project, LLC fell 11.6% from 2024 to 2025, from 640,376 MWh to 566,237 MWh. Through August 2026 it is running 28.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024640,376
2025566,237
2026 through August470,245
2025, same months367,125
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202658,078
July 202644,803
June 202655,793
May 202654,258
April 202670,347
March 202672,496
February 202650,340
January 202664,130
December 202561,460
November 202546,991
October 202555,200
September 202535,461
August 202542,440
July 202548,528
June 202547,730
May 202541,417
April 202548,519
March 202525,713
February 202557,091
January 202555,687
December 202455,010
November 202464,207
October 202462,833
September 202437,908
August 202440,398
July 202444,572
June 202449,825
May 202445,451
April 202465,593
March 202463,682
February 202461,110
January 202449,787

Source: EIA Form EIA-923, through August 2026.

How much of Oklahoma's electricity comes from the Sundance Wind Project, LLC plant?

Sundance Wind Project, LLC made 0.6% of the 89,758,877 MWh reported by Oklahoma plants in 2025, from 0.6% of the state's 35,828 MW of capacity. By capacity it is the 52nd largest of 143 plants in Oklahoma, the 1,649th largest of 14,327 in the U.S. and the 334th largest of 1,358 wind plants. By 2025 generation it is the 41st largest of 135 generating plants in the state.

Sundance Wind Project, LLC within Oklahoma, 2025
MeasureThis plantOklahomaShare
Capacity (MW)19935,8280.6%
Generation (MWh)566,23789,758,8770.6%
Wind capacity (MW)19913,3441.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sundance Wind Project, LLC plant, and when do they retire?

1 operable generator totals 199 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1199100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingOnshore Wind Turbine1992021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sundance Wind Project, LLC plant?

2 owners report shares in Sundance Wind Project, LLC; Southwestern Electric Power Co holds the largest named share, 54.8% or about 109 MW. Public Service Co of Oklahoma operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Southwestern Electric Power Co54.8%109310,298
Public Service Co of Oklahoma45.2%90255,939

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What does Public Service Co of Oklahoma charge homes?

Public Service Co of Oklahoma, the operator of Sundance Wind Project, LLC, had an average residential price of 14.23¢ per kWh and an average bill of $145 a month in 2025, 8% above the Oklahoma average of 13.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Oklahoma
Public Service Co of Oklahoma14.23¢$1458% higher
Oklahoma average13.21¢$141
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Sundance Wind Project, LLC plant?

Sundance Wind Project, LLC is in Alva, Woods County, Oklahoma, at 36.5597° N, 98.7492° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oklahoma are similar in size?

Oklahoma has 69 operable wind plants with 13,344 MW of capacity, and Sundance Wind Project, LLC's 199 MW is 1% of that.

Wind plants in Oklahoma around this size
PlantCountyMW2025 MWh
Frontier WindpowerKay200484,545
Ponderosa Wind Energy CenterBeaver200911,051
Seiling Wind IDewey199454,051
Sundance Wind Project, LLCWoods199566,237
Persimmon Creek Wind Farm 1, LLCWoodward199825,826
Elk City LLCRoger Mills198527,067
BluestemBeaver198758,986

Source: EIA Forms EIA-860 and EIA-923, 2025.