Solar power plant, Rhode Island
GD West Greenwich Nooseneck I, LLC solar power plant, Rhode Island
GD West Greenwich Nooseneck I, LLC is a 20 MW solar power plant in Kent County, Rhode Island, operated by GD West Greenwich Nooseneck I, LLC, and it generated 31,092 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Rhode Island, and its capacity factor sits at the 16th percentile of U.S. solar plants. By 2025 generation it ranks 4,700th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the GD West Greenwich Nooseneck I, LLC plant run compared with other solar plants?
The GD West Greenwich Nooseneck I, LLC plant had a capacity factor of 18% in 2025 on 20 MW of net summer capacity, the 16th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 65 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| GD West Greenwich Nooseneck I, LLC | 18% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the GD West Greenwich Nooseneck I, LLC plant generating more or less than last year?
Generation at GD West Greenwich Nooseneck I, LLC fell 6.0% from 2024 to 2025, from 33,086 MWh to 31,092 MWh.
| Period | MWh |
|---|---|
| 2024 | 33,086 |
| 2025 | 31,092 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,206 |
| November 2025 | 1,734 |
| October 2025 | 2,440 |
| September 2025 | 3,098 |
| August 2025 | 3,382 |
| July 2025 | 3,604 |
| June 2025 | 3,161 |
| May 2025 | 3,103 |
| April 2025 | 2,563 |
| March 2025 | 3,185 |
| February 2025 | 2,284 |
| January 2025 | 1,332 |
| December 2024 | 943 |
| November 2024 | 2,157 |
| October 2024 | 3,089 |
| September 2024 | 3,019 |
| August 2024 | 3,551 |
| July 2024 | 3,480 |
| June 2024 | 4,110 |
| May 2024 | 3,555 |
| April 2024 | 3,002 |
| March 2024 | 2,993 |
| February 2024 | 2,194 |
| January 2024 | 993 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the GD West Greenwich Nooseneck I, LLC plant, and when do they retire?
2 operable generators total 20 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 20 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| NORTH | Operating | Solar Photovoltaic | 10 | 2022 | n/a |
| SOUTH | Operating | Solar Photovoltaic | 10 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the GD West Greenwich Nooseneck I, LLC plant?
EIA lists no joint owners for GD West Greenwich Nooseneck I, LLC. GD West Greenwich Nooseneck I, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the GD West Greenwich Nooseneck I, LLC plant?
GD West Greenwich Nooseneck I, LLC is in West Greenwich, Kent County, Rhode Island, at 41.6060° N, 71.6470° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Rhode Island are similar in size?
Rhode Island has 77 operable solar plants with 452 MW of capacity, and GD West Greenwich Nooseneck I, LLC's 20 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Dry Bridge Solar (Brown University) | Washington | 40 | 67,601 |
| University Solar, LLC | Kent | 24 | 28,457 |
| GD West Greenwich Nooseneck I, LLC | Kent | 20 | 31,092 |
| Gold Meadow Farms | Kent | 16 | 27,053 |
| Alton Road Solar | Washington | 14 | 24,119 |
| TPE King Solar Holdings1, LLC (CSG) | Providence | 13 | 18,341 |
Source: EIA Forms EIA-860 and EIA-923, 2025.