Solar power plant, Nevada

Gemini Solar Hybrid power plant, Nevada

Gemini Solar Hybrid is a 1,070 MW power plant, 690 MW of it solar, in Clark County, Nevada, operated by Gemini Solar, and it generated 2,181,408 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.8% of the generation reported in Nevada, and its capacity factor sits at the 99th percentile of U.S. solar plants. By 2025 generation it ranks 480th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,070 MWNameplate capacity
37%Capacity factor, 2025, solar units, 99th percentile, on 690 MW net summer
4.8%Of NV generation, 2025
1 yearAverage generator age, by MW

How hard does the Gemini Solar Hybrid plant run compared with other solar plants?

The Gemini Solar Hybrid plant's solar units had a capacity factor of 37% in 2025 on 690 MW of net summer capacity, the 99th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 136 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Gemini Solar Hybrid37%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Gemini Solar Hybrid plant generating more or less than last year?

Gemini Solar Hybrid generated 2,181,408 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 7.0% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
20241,600,785
20252,181,408
2026 through August1,517,195
2025, same months1,631,679
Monthly generation, Mar 2024 to Aug 2026
MonthMWh
August 2026196,133
July 2026227,940
June 2026246,561
May 2026219,580
April 2026220,092
March 2026185,192
February 2026119,708
January 2026101,989
December 202591,062
November 2025104,838
October 2025167,956
September 2025185,873
August 2025221,013
July 2025249,704
June 2025254,867
May 2025243,556
April 2025220,540
March 2025181,672
February 2025138,281
January 2025122,046
December 2024130,703
November 2024118,063
October 2024156,136
September 2024192,869
August 2024224,342
July 2024222,907
June 2024232,365
May 2024209,284
April 2024102,004
March 202412,112

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Gemini Solar Hybrid plant?

Gemini Solar Hybrid made 4.8% of the 45,180,066 MWh reported by Nevada plants in 2025, from 5.6% of the state's 18,959 MW of capacity. By capacity it is the 4th largest of 117 plants in Nevada, the 282nd largest of 14,327 in the U.S. and the largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 5th largest of 112 generating plants in the state.

Gemini Solar Hybrid within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)1,07018,9595.6%
Generation (MWh)2,181,40845,180,0664.8%
Solar capacity (MW)6905,19513.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Gemini Solar Hybrid plant, and when do they retire?

2 operable generators total 1,070 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s21,070100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ARBE1OperatingSolar Photovoltaic6902024n/a
ARPV1OperatingBatteries3802024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Gemini Solar Hybrid plant?

Solar Partners XI LLC is the only joint owner reported for Gemini Solar Hybrid, with 100.0%. Gemini Solar operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Gemini Solar Hybrid plant use?

Gemini Solar Hybrid has capacity on 2 fuels: 64% solar and 36% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar69064.5%2,246,189
Battery and pumped storage38035.5%-64,781

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Gemini Solar Hybrid plant?

Gemini Solar Hybrid is in Unincorporated, Clark County, Nevada, at 36.4678° N, 114.8060° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.