Petroleum power plant, Connecticut
GenConn Middletown LLC petroleum power plant, Connecticut
GenConn Middletown LLC is a 242 MW petroleum power plant in Middlesex County, Connecticut, operated by GenConn Middletown LLC, and it generated 6,480 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 31st percentile of U.S. petroleum plants. By 2025 generation it ranks 7,470th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the GenConn Middletown LLC plant run compared with other petroleum plants?
The GenConn Middletown LLC plant had a capacity factor of under 1% in 2025 on 188 MW of net summer capacity, the 31st percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.
0%Shaded: the middle half of petroleum plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| GenConn Middletown LLC | under 1% |
| Petroleum plants, 75th percentile | 1% |
| Petroleum plants, median | 1% |
| Petroleum plants, 25th percentile | 0% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the GenConn Middletown LLC plant generating more or less than last year?
Generation at GenConn Middletown LLC rose 9.1% from 2024 to 2025, from 5,940 MWh to 6,480 MWh.
| Period | MWh |
|---|---|
| 2024 | 5,940 |
| 2025 | 6,480 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 329 |
| November 2025 | 574 |
| October 2025 | 492 |
| September 2025 | 300 |
| August 2025 | 1,314 |
| July 2025 | 369 |
| June 2025 | 336 |
| May 2025 | 205 |
| April 2025 | 365 |
| March 2025 | 387 |
| February 2025 | 1,122 |
| January 2025 | 686 |
| December 2024 | 744 |
| November 2024 | 384 |
| October 2024 | 494 |
| September 2024 | 418 |
| August 2024 | 419 |
| July 2024 | 413 |
| June 2024 | 386 |
| May 2024 | 404 |
| April 2024 | 326 |
| March 2024 | 468 |
| February 2024 | 499 |
| January 2024 | 983 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the GenConn Middletown LLC plant, and when do they retire?
4 operable generators total 242 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 4 | 242 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 12 | Operating | Petroleum Liquids | 61 | 2011 | n/a |
| 13 | Operating | Petroleum Liquids | 61 | 2011 | n/a |
| 14 | Operating | Petroleum Liquids | 61 | 2011 | n/a |
| 15 | Operating | Petroleum Liquids | 61 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the GenConn Middletown LLC plant?
EIA lists no joint owners for GenConn Middletown LLC. GenConn Middletown LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the GenConn Middletown LLC plant?
GenConn Middletown LLC is in Middletown, Middlesex County, Connecticut, at 41.5544° N, 72.5767° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which petroleum plants in Connecticut are similar in size?
Connecticut has 23 operable petroleum plants with 2,531 MW of capacity, and GenConn Middletown LLC's 242 MW is 10% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Middletown | Middlesex | 433 | 88,927 |
| Montville Station | New London | 420 | 100,471 |
| GenConn Middletown LLC | Middlesex | 242 | 5,013 |
| GenConn Devon LLC | New Haven | 242 | 11,407 |
| Devon Station | New Haven | 223 | -1,146 |
Source: EIA Forms EIA-860 and EIA-923, 2025.