Skip to main content
RateWatt

Petroleum power plant, Connecticut

Middletown petroleum power plant, Connecticut

Middletown is a 786 MW power plant, 433 MW of it petroleum, in Middlesex County, Connecticut, operated by Middletown Power LLC, and it generated 86,758 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Connecticut, and its capacity factor sits at the 80th percentile of U.S. petroleum plants. By 2025 generation it ranks 3,560th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

786 MWNameplate capacity
2%Capacity factor, 2025, petroleum units, 80th percentile, on 417 MW net summer
0.2%Of CT generation, 2025
57 yearsAverage generator age, by MW

How hard does the Middletown plant run compared with other petroleum plants?

The Middletown plant's petroleum units had a capacity factor of 2% in 2025 on 417 MW of net summer capacity, the 80th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. That equals about 9 days at full output out of 365.

0%Shaded: the middle half of petroleum plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Middletown2%
Petroleum plants, 75th percentile1%
Petroleum plants, median1%
Petroleum plants, 25th percentile0%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its petroleum generators only. Values above 105% are left out of the comparison.

Is the Middletown plant generating more or less than last year?

Middletown generated 86,758 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 4 months, so the two years are not compared.

18 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202432,953
202586,758
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025-497
November 2025-440
October 2025-332
September 2025-313
August 2025-400
July 2025-389
June 2025-467
May 2025-727
April 2025-910
March 2025-1,155
February 202524,490
January 202567,898
December 202417,487
November 2024-910
October 2024-963
September 2024-931
August 20243,315
July 202413,889
June 20246,689
May 2024-901
April 2024-955
March 2024-1,144
February 2024-1,290
January 2024-1,334

Source: EIA Form EIA-923, through August 2026.

How much of Connecticut's electricity comes from the Middletown plant?

Middletown made 0.2% of the 43,744,586 MWh reported by Connecticut plants in 2025, from 7.2% of the state's 10,990 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 4th largest of 182 plants in Connecticut, the 422nd largest of 14,327 in the U.S. and the 14th largest of 861 petroleum plants on its petroleum units alone. By 2025 generation it is the 24th largest of 168 generating plants in the state.

Middletown within Connecticut, 2025
MeasureThis plantConnecticutShare
Capacity (MW)78610,9907.2%
Generation (MWh)86,75843,744,5860.2%
Petroleum capacity (MW)4332,53117.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Middletown plant, and when do they retire?

4 operable generators total 786 MW, with an average age of 57 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 69 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s111414%none reported
1960s225833%none reported
1970s141553%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2Out of serviceNatural Gas Steam Turbine1141958n/a
3Out of serviceNatural Gas Steam Turbine2391964n/a
10Out of servicePetroleum Liquids191966n/a
4Out of servicePetroleum Liquids4151973n/a
1RetiredPetroleum Liquids6919541998

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Middletown plant?

EIA lists no joint owners for Middletown. Middletown Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Middletown plant use?

Middletown has capacity on 2 fuels: 55% petroleum and 45% natural gas. In 2025, petroleum made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Petroleum43355.1%88,927
Natural gas35344.9%-2,169

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Middletown plant?

Middletown is in Middletown, Middlesex County, Connecticut, at 41.5549° N, 72.5791° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which petroleum plants in Connecticut are similar in size?

Connecticut has 23 operable petroleum plants with 2,531 MW of capacity, and Middletown's 433 MW is 17% of that.

Petroleum plants in Connecticut around this size
PlantCountyMW2025 MWh
New Haven SteamNew Haven64238,496
MiddletownMiddlesex43388,927
Montville StationNew London420100,471
GenConn Middletown LLCMiddlesex2425,013
GenConn Devon LLCNew Haven24211,407

Source: EIA Forms EIA-860 and EIA-923, 2025.