Skip to main content
RateWatt

Biomass power plant, Alabama

Georgia-Pacific Brewton Mill biomass power plant, Alabama

Georgia-Pacific Brewton Mill is a 103 MW power plant, 75 MW of it biomass, in Escambia County, Alabama, operated by Georgia-Pacific Brewton LLC, and it generated 422,949 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Alabama, and its capacity factor sits at the 45th percentile of U.S. biomass plants. By 2025 generation it ranks 1,521st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

103 MWNameplate capacity
46%Capacity factor, 2025, biomass units, 45th percentile, on 56 MW net summer
0.3%Of AL generation, 2025
20 yearsAverage generator age, by MW

How hard does the Georgia-Pacific Brewton Mill plant run compared with other biomass plants?

The Georgia-Pacific Brewton Mill plant's biomass units had a capacity factor of 46% in 2025 on 56 MW of net summer capacity, the 45th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 167 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Georgia-Pacific Brewton Mill46%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its biomass generators only. Values above 105% are left out of the comparison.

Is the Georgia-Pacific Brewton Mill plant generating more or less than last year?

Generation at Georgia-Pacific Brewton Mill fell 15.3% from 2024 to 2025, from 499,441 MWh to 422,949 MWh.

Net generation by period
PeriodMWh
2024499,441
2025422,949
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202535,008
November 202539,926
October 202539,800
September 202541,714
August 202540,989
July 202541,869
June 202521,311
May 202511,220
April 202535,703
March 202541,821
February 202537,396
January 202536,191
December 202439,460
November 202441,464
October 202438,756
September 202440,321
August 202441,793
July 202441,240
June 202438,304
May 202440,380
April 202445,365
March 202447,034
February 202443,074
January 202442,251

Source: EIA Form EIA-923, through August 2026.

How much of Alabama's electricity comes from the Georgia-Pacific Brewton Mill plant?

Georgia-Pacific Brewton Mill made 0.3% of the 141,699,034 MWh reported by Alabama plants in 2025, from 0.3% of the state's 32,890 MW of capacity. By capacity it is the 36th largest of 78 plants in Alabama, the 2,528th largest of 14,327 in the U.S. and the 39th largest of 585 biomass plants on its biomass units alone. By 2025 generation it is the 31st largest of 74 generating plants in the state.

Georgia-Pacific Brewton Mill within Alabama, 2025
MeasureThis plantAlabamaShare
Capacity (MW)10332,8900.3%
Generation (MWh)422,949141,699,0340.3%
Biomass capacity (MW)7562212.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Georgia-Pacific Brewton Mill plant, and when do they retire?

3 operable generators total 103 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 12.5 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s11312%none reported
1980s11615%none reported
2010s17573%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2TGOperatingNatural Gas Steam Turbine131964n/a
3TGOperatingNatural Gas Steam Turbine161982n/a
4TGOperatingWood/Wood Waste Biomass752017n/a
1TGRetiredWood/Wood Waste Biomass1319572017

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Georgia-Pacific Brewton Mill plant?

EIA lists no joint owners for Georgia-Pacific Brewton Mill. Georgia-Pacific Brewton LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Georgia-Pacific Brewton Mill plant use?

Georgia-Pacific Brewton Mill has capacity on 2 fuels: 73% biomass and 27% natural gas. In 2025, biomass made 53% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Biomass7572.5%224,450
Natural gas2827.5%198,499

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Georgia-Pacific Brewton Mill plant?

Georgia-Pacific Brewton Mill is in Brewton, Escambia County, Alabama, at 31.0770° N, 87.1116° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Alabama are similar in size?

Alabama has 11 operable biomass plants with 622 MW of capacity, and Georgia-Pacific Brewton Mill's 75 MW is 12% of that.

Biomass plants in Alabama around this size
PlantCountyMW2025 MWh
International Paper Prattville MillAutauga90436,904
Georgia-Pacific Consr Prods LP-NaheolaChoctaw88353,218
International Paper Pine Hill MillWilcox77304,490
Georgia-Pacific Brewton MillEscambia75224,450
Alabama Pine PulpMonroe69382,221
Alabama River PulpMonroe48293,654
WestRock Demopolis MillMarengo47279,827

Source: EIA Forms EIA-860 and EIA-923, 2025.