Biomass power plant, Oregon

Georgia-Pacific Wauna Mill biomass power plant, Oregon

Georgia-Pacific Wauna Mill is a 30 MW biomass power plant in Clatsop County, Oregon, operated by Georgia-Pacific Wauna LLC, and it generated 168,398 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Oregon, and its capacity factor sits at the 58th percentile of U.S. biomass plants. By 2025 generation it ranks 2,729th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30 MWNameplate capacity
53%Capacity factor, 2025, 58th percentile, on 24 MW net summer
0.3%Of OR generation, 2025
29 yearsAverage generator age, by MW

How hard does the Georgia-Pacific Wauna Mill plant run compared with other biomass plants?

The Georgia-Pacific Wauna Mill plant had a capacity factor of 53% in 2025 on 24 MW of net summer capacity, the 58th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 193 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Georgia-Pacific Wauna Mill53%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Georgia-Pacific Wauna Mill plant generating more or less than last year?

Generation at Georgia-Pacific Wauna Mill fell 14.9% from 2024 to 2025, from 197,795 MWh to 168,398 MWh. Through August 2026 it is running 4.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024197,795
2025168,398
2026 through August108,802
2025, same months104,101
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,028
July 20269,235
June 202613,954
May 202610,672
April 202614,142
March 202618,481
February 202616,763
January 202616,527
December 202516,427
November 202518,203
October 202516,348
September 202513,319
August 202512,792
July 202517,013
June 2025168
May 20253,796
April 202517,927
March 202518,366
February 202516,421
January 202517,618
December 202418,683
November 202417,298
October 202418,834
September 202415,204
August 202414,493
July 202416,035
June 202415,180
May 202416,157
April 202417,531
March 202415,204
February 202417,019
January 202416,157

Source: EIA Form EIA-923, through August 2026.

How much of Oregon's electricity comes from the Georgia-Pacific Wauna Mill plant?

Georgia-Pacific Wauna Mill made 0.3% of the 64,124,656 MWh reported by Oregon plants in 2025, from 0.2% of the state's 19,040 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 71st largest of 302 plants in Oregon, the 4,354th largest of 14,327 in the U.S. and the 141st largest of 585 biomass plants. By 2025 generation it is the 48th largest of 278 generating plants in the state.

Georgia-Pacific Wauna Mill within Oregon, 2025
MeasureThis plantOregonShare
Capacity (MW)3019,0400.2%
Generation (MWh)168,39864,124,6560.3%
Biomass capacity (MW)3028510.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Georgia-Pacific Wauna Mill plant, and when do they retire?

1 operable generator totals 30 MW, with an average age of 29 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s130100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingWood/Wood Waste Biomass301996n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Georgia-Pacific Wauna Mill plant?

EIA lists no joint owners for Georgia-Pacific Wauna Mill. Georgia-Pacific Wauna LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Georgia-Pacific Wauna Mill plant?

Georgia-Pacific Wauna Mill is in Clatskanie, Clatsop County, Oregon, at 46.1540° N, 123.4066° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Oregon are similar in size?

Oregon has 22 operable biomass plants with 285 MW of capacity, and Georgia-Pacific Wauna Mill's 30 MW is 11% of that.

Biomass plants in Oregon around this size
PlantCountyMW2025 MWh
Dillard ComplexDouglas52107,837
Biomass One LPJackson40199,193
IP Springfield OregonLane33141,432
Georgia-Pacific Wauna MillClatsop30111,319
Evergreen BioPower LLCLinn2147,873
Seneca Sustainable Energy LLCLane20120,735
Georgia-Pacific Toledo MillLincoln1932,328

Source: EIA Forms EIA-860 and EIA-923, 2025.