Goat Wind LP power plant, Texas

Goat Wind LP is a 150 MW wind power plant in Sterling County, Texas, operated by Goat Wind LLC, and it generated 271,373 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 12th percentile of U.S. wind plants. By 2025 generation it ranks 2,101st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
21%Capacity factor, 2025, 12th percentile, on 150 MW net summer
2,101stU.S. rank by generation, 2025
17 yearsAverage generator age, by MW

How hard does the Goat Wind LP plant run compared with other wind plants?

The Goat Wind LP plant had a capacity factor of 21% in 2025 on 150 MW of net summer capacity, the 12th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 76 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Goat Wind LP21%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Goat Wind LP plant generating more or less than last year?

Generation at Goat Wind LP rose 21.9% from 2024 to 2025, from 222,544 MWh to 271,373 MWh.

Net generation by period
PeriodMWh
2024222,544
2025271,373
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202529,923
November 202521,215
October 202522,541
September 202519,350
August 202518,863
July 202523,268
June 202530,634
May 202521,523
April 202527,040
March 202521,503
February 202519,134
January 202516,379
December 202420,496
November 202422,024
October 202415,896
September 202411,878
August 202420,946
July 202419,535
June 202420,545
May 202418,723
April 202417,987
March 202414,604
February 202424,609
January 202415,301

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Goat Wind LP plant?

Goat Wind LP made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 432nd largest of 1,023 plants in Texas, the 2,066th largest of 14,327 in the U.S. and the 482nd largest of 1,358 wind plants. By 2025 generation it is the 405th largest of 816 generating plants in the state.

Goat Wind LP within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)150195,9660.1%
Generation (MWh)271,373592,896,1760.0%
Wind capacity (MW)15043,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Goat Wind LP plant, and when do they retire?

2 operable generators total 150 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s2150100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine802008n/a
2OperatingOnshore Wind Turbine702009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Goat Wind LP plant?

3 owners report shares in Goat Wind LP; NRG Energy, Inc holds the largest named share, 99.9% or about 149 MW. Goat Wind LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
NRG Energy, Inc99.9%149271,102
Cielo Goat Limited0.1%0217
Mission Wind Goat Mountain Inc0.0%054

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Goat Wind LP plant?

Goat Wind LP is in Sterling City, Sterling County, Texas, at 31.9519° N, 100.7914° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Goat Wind LP's 150 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Briscoe Wind FarmBriscoe150420,754
Wildcat Ranch Wind ProjectCochran150651,907
La Casa WindStephens15055,436
Goat Wind LPSterling150271,373
RockspringsVal Verde149491,159
Blue Cloud Wind Energy LLCBailey148564,040
Cactus Flats Wind Energy ProjectConcho148439,139