Solar power plant, Washington
Goose Prairie Solar power plant, Washington
Goose Prairie Solar is a 80 MW solar power plant in Yakima County, Washington, operated by Goose Prairie Solar LLC, and it generated 177,350 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Washington, and its capacity factor sits at the 67th percentile of U.S. solar plants. By 2025 generation it ranks 2,673rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Goose Prairie Solar plant run compared with other solar plants?
The Goose Prairie Solar plant had a capacity factor of 25% in 2025 on 80 MW of net summer capacity, the 67th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Goose Prairie Solar | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Goose Prairie Solar plant generating more or less than last year?
Goose Prairie Solar generated 177,350 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.5% ahead of the same months of 2025. 2024 has output for only 5 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 4,714 |
| 2025 | 177,350 |
| 2026 through August | 145,346 |
| 2025, same months | 140,463 |
Monthly generation, Aug 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 23,614 |
| July 2026 | 27,028 |
| June 2026 | 25,157 |
| May 2026 | 24,078 |
| April 2026 | 19,908 |
| March 2026 | 15,135 |
| February 2026 | 6,638 |
| January 2026 | 3,788 |
| December 2025 | 3,140 |
| November 2025 | 5,508 |
| October 2025 | 11,520 |
| September 2025 | 16,719 |
| August 2025 | 21,666 |
| July 2025 | 25,818 |
| June 2025 | 24,599 |
| May 2025 | 22,996 |
| April 2025 | 20,566 |
| March 2025 | 12,379 |
| February 2025 | 6,561 |
| January 2025 | 5,878 |
| December 2024 | 2,657 |
| November 2024 | 344 |
| October 2024 | 1,476 |
| September 2024 | 204 |
| August 2024 | 33 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Goose Prairie Solar plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GOOSE | Operating | Solar Photovoltaic | 80 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Goose Prairie Solar plant?
EIA lists no joint owners for Goose Prairie Solar. Goose Prairie Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Goose Prairie Solar plant?
Goose Prairie Solar is in Moxee, Yakima County, Washington, at 46.5292° N, 120.2395° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Washington are similar in size?
Washington has 7 operable solar plants with 267 MW of capacity, and Goose Prairie Solar's 80 MW is 30% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Lund Hill Solar | Klickitat | 150 | 367,318 |
| Goose Prairie Solar | Yakima | 80 | 177,350 |
Source: EIA Forms EIA-860 and EIA-923, 2025.