Solar power plant, Washington
Lund Hill Solar power plant, Washington
Lund Hill Solar is a 150 MW solar power plant in Klickitat County, Washington, operated by Avangrid Power LLC, and it generated 367,318 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Washington, and its capacity factor sits at the 82nd percentile of U.S. solar plants. By 2025 generation it ranks 1,701st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lund Hill Solar plant run compared with other solar plants?
The Lund Hill Solar plant had a capacity factor of 28% in 2025 on 150 MW of net summer capacity, the 82nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lund Hill Solar | 28% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lund Hill Solar plant generating more or less than last year?
Generation at Lund Hill Solar rose 3.9% from 2024 to 2025, from 353,568 MWh to 367,318 MWh. Through August 2026 it is running 0.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 353,568 |
| 2025 | 367,318 |
| 2026 through August | 289,696 |
| 2025, same months | 288,349 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 48,250 |
| July 2026 | 51,168 |
| June 2026 | 50,306 |
| May 2026 | 48,691 |
| April 2026 | 38,699 |
| March 2026 | 30,533 |
| February 2026 | 13,213 |
| January 2026 | 8,836 |
| December 2025 | 8,575 |
| November 2025 | 11,317 |
| October 2025 | 23,766 |
| September 2025 | 35,311 |
| August 2025 | 44,526 |
| July 2025 | 52,175 |
| June 2025 | 51,045 |
| May 2025 | 47,018 |
| April 2025 | 39,851 |
| March 2025 | 23,729 |
| February 2025 | 15,643 |
| January 2025 | 14,362 |
| December 2024 | 6,393 |
| November 2024 | 11,500 |
| October 2024 | 25,869 |
| September 2024 | 35,486 |
| August 2024 | 45,182 |
| July 2024 | 45,964 |
| June 2024 | 48,554 |
| May 2024 | 44,416 |
| April 2024 | 35,718 |
| March 2024 | 32,177 |
| February 2024 | 13,698 |
| January 2024 | 8,611 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lund Hill Solar plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LHS1 | Operating | Solar Photovoltaic | 150 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lund Hill Solar plant?
EIA lists no joint owners for Lund Hill Solar. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Lund Hill Solar plant?
Lund Hill Solar is in Bickleton, Klickitat County, Washington, at 45.8880° N, 120.3550° W. It sits in the Avangrid Renewables LLC balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Washington are similar in size?
Washington has 7 operable solar plants with 267 MW of capacity, and Lund Hill Solar's 150 MW is 56% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Lund Hill Solar | Klickitat | 150 | 367,318 |
| Goose Prairie Solar | Yakima | 80 | 177,350 |
Source: EIA Forms EIA-860 and EIA-923, 2025.