Grapeland Hybrid is a 59.8 MW power plant, 49.8 MW of it natural gas, in San Bernardino County, California, operated by Southern California Edison Co, and it generated 2,190 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 6th percentile of U.S. natural gas plants. By 2025 generation it ranks 10,469th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

59.8 MWNameplate capacity
under 1%Capacity factor, 2025, natural gas units, 6th percentile, on 46 MW net summer
10,469thU.S. rank by generation, 2025
16 yearsAverage generator age, by MW

How hard does the Grapeland Hybrid plant run compared with other natural gas plants?

The Grapeland Hybrid plant's natural gas units had a capacity factor of under 1% in 2025 on 46 MW of net summer capacity, the 6th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Grapeland Hybridunder 1%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Grapeland Hybrid plant generating more or less than last year?

Generation at Grapeland Hybrid fell 43.3% from 2024 to 2025, from 3,862 MWh to 2,190 MWh.

Net generation by period
PeriodMWh
20243,862
20252,190
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202581
November 202524
October 202558
September 2025305
August 2025268
July 2025154
June 2025169
May 2025565
April 202523
March 2025398
February 202559
January 202585
December 202480
November 2024602
October 2024180
September 2024410
August 2024466
July 202492
June 2024721
May 2024181
April 2024117
March 2024429
February 202479
January 2024504

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Grapeland Hybrid plant?

Grapeland Hybrid made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 385th largest of 1,877 plants in California, the 3,551st largest of 14,327 in the U.S. and the 1,079th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 1,353rd largest of 1,608 generating plants in the state.

Grapeland Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)60107,4330.1%
Generation (MWh)2,190204,542,8980.0%
Natural gas capacity (MW)5040,2110.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Grapeland Hybrid plant, and when do they retire?

2 operable generators total 59.8 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s15083%none reported
2010s11017%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine502007n/a
BA1OperatingBatteries102016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Grapeland Hybrid plant?

EIA lists no joint owners for Grapeland Hybrid. Southern California Edison Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Southern California Edison Co charge homes?

Southern California Edison Co, the operator of Grapeland Hybrid, had an average residential price of 31.48¢ per kWh and an average bill of $149 a month in 2025, about the same as the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Southern California Edison Co31.48¢$149about the same
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Grapeland Hybrid plant use?

Grapeland Hybrid has capacity on 2 fuels: 83% natural gas and 17% battery and pumped storage. In 2025, natural gas made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas5083.3%2,190
Battery and pumped storage1016.7%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Grapeland Hybrid plant?

Grapeland Hybrid is in Rancho Cucamonga, San Bernardino County, California, at 34.0903° N, 117.5343° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and Grapeland Hybrid's 49.8 MW is 0% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Kern Front LimitedKern505,442
High Sierra LimitedKern505,585
McGrath PeakerVentura502,632
Grapeland HybridSan Bernardino502,190
Mira Loma PeakerSan Bernardino501,052
Barre PeakerOrange505,447
Center HybridLos Angeles501,974