Skip to main content
RateWatt

Natural gas power plant, California

Center Hybrid natural gas power plant, California

Center Hybrid is a 59.8 MW power plant, 49.8 MW of it natural gas, in Los Angeles County, California, operated by Southern California Edison Co, and it generated 1,974 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 5th percentile of U.S. natural gas plants. By 2025 generation it ranks 10,769th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

59.8 MWNameplate capacity
under 1%Capacity factor, 2025, natural gas units, 5th percentile, on 47 MW net summer
10,769thU.S. rank by generation, 2025
16 yearsAverage generator age, by MW

How hard does the Center Hybrid plant run compared with other natural gas plants?

The Center Hybrid plant's natural gas units had a capacity factor of under 1% in 2025 on 47 MW of net summer capacity, the 5th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Center Hybridunder 1%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Center Hybrid plant generating more or less than last year?

Generation at Center Hybrid fell 72.4% from 2024 to 2025, from 7,157 MWh to 1,974 MWh.

Net generation by period
PeriodMWh
20247,157
20251,974
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252
November 202533
October 202557
September 2025397
August 2025465
July 2025156
June 2025198
May 2025629
April 202515
March 20259
February 202514
January 20250
December 202466
November 20241,389
October 2024695
September 2024728
August 20241,884
July 2024383
June 2024400
May 2024615
April 202455
March 2024343
February 202462
January 2024537

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Center Hybrid plant?

Center Hybrid made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 385th largest of 1,877 plants in California, the 3,551st largest of 14,327 in the U.S. and the 1,082nd largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 1,384th largest of 1,608 generating plants in the state.

Center Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)60107,4330.1%
Generation (MWh)1,974204,542,8980.0%
Natural gas capacity (MW)5040,2110.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Center Hybrid plant, and when do they retire?

2 operable generators total 59.8 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s15083%none reported
2010s11017%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine502007n/a
BA1OperatingBatteries102016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Center Hybrid plant?

EIA lists no joint owners for Center Hybrid. Southern California Edison Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Southern California Edison Co charge homes?

Southern California Edison Co, the operator of Center Hybrid, had an average residential price of 31.48¢ per kWh and an average bill of $149 a month in 2025, about the same as the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Southern California Edison Co31.48¢$149about the same
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Center Hybrid plant use?

Center Hybrid has capacity on 2 fuels: 83% natural gas and 17% battery and pumped storage. In 2025, natural gas made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas5083.3%1,974
Battery and pumped storage1016.7%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Center Hybrid plant?

Center Hybrid is in Norwalk, Los Angeles County, California, at 33.9296° N, 118.1046° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and Center Hybrid's 49.8 MW is 0% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Grapeland HybridSan Bernardino502,190
Mira Loma PeakerSan Bernardino501,052
Barre PeakerOrange505,447
Center HybridLos Angeles501,974
Chowchilla IIMadera5013,727
Greenleaf 2 Power PlantSutter5036,783
AltaGas Ripon Energy Inc.San Joaquin50920

Source: EIA Forms EIA-860 and EIA-923, 2025.