Natural gas power plant, California
AltaGas Ripon Energy Inc. natural gas power plant, California
AltaGas Ripon Energy Inc. is a 49.5 MW natural gas power plant in San Joaquin County, California, operated by AltaGas Ripon Energy Inc., and it generated 920 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 2nd percentile of U.S. natural gas plants. By 2025 generation it ranks 11,890th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the AltaGas Ripon Energy Inc. plant run compared with other natural gas plants?
The AltaGas Ripon Energy Inc. plant had a capacity factor of under 1% in 2025 on 46.1 MW of net summer capacity, the 2nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. It ran for only a few hours of the year at full output.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| AltaGas Ripon Energy Inc. | under 1% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the AltaGas Ripon Energy Inc. plant generating more or less than last year?
AltaGas Ripon Energy Inc. generated 920 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 105.5% ahead of the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 2,195 |
| 2025 | 920 |
| 2026 through August | 1,708 |
| 2025, same months | 831 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 301 |
| July 2026 | 241 |
| June 2026 | 303 |
| May 2026 | 0 |
| April 2026 | 38 |
| March 2026 | 704 |
| February 2026 | 47 |
| January 2026 | 74 |
| December 2025 | 0 |
| November 2025 | 0 |
| October 2025 | 0 |
| September 2025 | 89 |
| August 2025 | 89 |
| July 2025 | 0 |
| June 2025 | 0 |
| May 2025 | 97 |
| April 2025 | 0 |
| March 2025 | 0 |
| February 2025 | 645 |
| January 2025 | 0 |
| December 2024 | 0 |
| November 2024 | 88 |
| October 2024 | 579 |
| September 2024 | 74 |
| August 2024 | 76 |
| July 2024 | 700 |
| June 2024 | 23 |
| May 2024 | 0 |
| April 2024 | 77 |
| March 2024 | 508 |
| February 2024 | 70 |
| January 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the AltaGas Ripon Energy Inc. plant, and when do they retire?
1 operable generator totals 49.5 MW, with an average age of 37 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Natural Gas Fired Combustion Turbine | 50 | 1988 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the AltaGas Ripon Energy Inc. plant?
EIA lists no joint owners for AltaGas Ripon Energy Inc.. AltaGas Ripon Energy Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the AltaGas Ripon Energy Inc. plant?
AltaGas Ripon Energy Inc. is in Ripon, San Joaquin County, California, at 37.7325° N, 121.1160° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and AltaGas Ripon Energy Inc.'s 49.5 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Center Hybrid | Los Angeles | 50 | 1,974 |
| Chowchilla II | Madera | 50 | 13,727 |
| Greenleaf 2 Power Plant | Sutter | 50 | 36,783 |
| AltaGas Ripon Energy Inc. | San Joaquin | 50 | 920 |
| Santa Ynez Facility | Santa Barbara | 49 | n/a |
| Clearwater Power Plant | Riverside | 49 | 3,539 |
| Kern River Eastridge Cogen | Kern | 49 | 224,726 |
Source: EIA Forms EIA-860 and EIA-923, 2025.