Greenup Hydro hydroelectric power plant, Ohio

Greenup Hydro is a 70.2 MW hydro power plant in Scioto County, Ohio, operated by City of Hamilton-(OH), and it generated 265,592 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Ohio, and its capacity factor sits at the 74th percentile of U.S. hydro plants. By 2025 generation it ranks 2,132nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

70.2 MWNameplate capacity
43%Capacity factor, 2025, 74th percentile, on 70.2 MW net summer
0.2%Of OH generation, 2025
43 yearsAverage generator age, by MW

How hard does the Greenup Hydro plant run compared with other hydro plants?

The Greenup Hydro plant had a capacity factor of 43% in 2025 on 70.2 MW of net summer capacity, the 74th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 158 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Greenup Hydro43%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Greenup Hydro plant generating more or less than last year?

Generation at Greenup Hydro rose 1.6% from 2024 to 2025, from 261,456 MWh to 265,592 MWh.

Net generation by period
PeriodMWh
2024261,456
2025265,592
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202527,860
November 202528,011
October 202521,553
September 202516,217
August 202521,963
July 202523,094
June 202511,088
May 202530,017
April 202517,055
March 202530,017
February 20253,839
January 202534,878
December 202433,951
November 202427,657
October 202416,280
September 202418,356
August 202425,672
July 202423,709
June 202430,004
May 202432,350
April 20246,502
March 202412,133
February 202415,275
January 202419,567

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Greenup Hydro plant?

Greenup Hydro made 0.2% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.2% of the state's 34,392 MW of capacity. By capacity it is the 63rd largest of 215 plants in Ohio, the 3,341st largest of 14,327 in the U.S. and the 217th largest of 1,393 hydro plants. By 2025 generation it is the 50th largest of 187 generating plants in the state.

Greenup Hydro within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)7034,3920.2%
Generation (MWh)265,592145,060,4990.2%
Hydro capacity (MW)7012356.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Greenup Hydro plant, and when do they retire?

3 operable generators total 70.2 MW, with an average age of 43 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s370100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric231982n/a
2OperatingConventional Hydroelectric231982n/a
3OperatingConventional Hydroelectric231982n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Greenup Hydro plant?

2 owners report shares in Greenup Hydro; City of Hamilton-(OH) holds the largest named share, 51.4% or about 36.1 MW. City of Hamilton-(OH) operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
City of Hamilton-(OH)51.4%36136,514
American Mun Power-Ohio, Inc48.6%34129,078

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What does City of Hamilton charge homes?

City of Hamilton, the operator of Greenup Hydro, had an average residential price of 15.49¢ per kWh and an average bill of $123 a month in 2025, 8% below the Ohio average of 16.90¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Ohio
City of Hamilton15.49¢$1238% lower
Ohio average16.90¢$148
U.S. average17.23¢$1512% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Greenup Hydro plant?

Greenup Hydro is in Franklin Furnace, Scioto County, Ohio, at 38.6472° N, 82.8594° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Ohio are similar in size?

Ohio has 4 operable hydro plants with 123 MW of capacity, and Greenup Hydro's 70.2 MW is 57% of that.

Hydro plants in Ohio around this size
PlantCountyMW2025 MWh
Greenup HydroScioto70265,592
RacineMeigs47190,006

Source: EIA Forms EIA-860 and EIA-923, 2025.