Grizzly hydroelectric power plant, California

Grizzly is a 22 MW hydro power plant in Plumas County, California, operated by City of Santa Clara-(CA), and it generated 43,251 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 38th percentile of U.S. hydro plants. By 2025 generation it ranks 4,259th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

22 MWNameplate capacity
28%Capacity factor, 2025, 38th percentile, on 17.7 MW net summer
4,259thU.S. rank by generation, 2025
32 yearsAverage generator age, by MW

How hard does the Grizzly plant run compared with other hydro plants?

The Grizzly plant had a capacity factor of 28% in 2025 on 17.7 MW of net summer capacity, the 38th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 102 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Grizzly28%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Grizzly plant generating more or less than last year?

Grizzly generated 43,251 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
202429,588
202543,251
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20253,294
November 20252,139
October 20250
September 20254,965
August 2025264
July 20255,020
June 20252,785
May 20252,872
April 20251,234
March 20257,752
February 20258,095
January 20254,831
December 20243,421
November 20241
October 20240
September 20240
August 20240
July 20241,536
June 20245,717
May 20242,620
April 20241,435
March 20246,445
February 20247,125
January 20241,288

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Grizzly plant?

Grizzly made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 606th largest of 1,877 plants in California, the 4,688th largest of 14,327 in the U.S. and the 424th largest of 1,393 hydro plants. By 2025 generation it is the 496th largest of 1,608 generating plants in the state.

Grizzly within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)22107,4330.0%
Generation (MWh)43,251204,542,8980.0%
Hydro capacity (MW)229,9360.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Grizzly plant, and when do they retire?

1 operable generator totals 22 MW, with an average age of 32 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s122100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NA1OperatingConventional Hydroelectric221993n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Grizzly plant?

EIA lists no joint owners for Grizzly. City of Santa Clara-(CA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Santa Clara charge homes?

City of Santa Clara, the operator of Grizzly, had an average residential price of 17.88¢ per kWh and an average bill of $71 a month in 2025, 43% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
City of Santa Clara17.88¢$7143% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Grizzly plant?

Grizzly is in N/A, Plumas County, California, at 39.8893° N, 121.2792° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and Grizzly's 22 MW is 0% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
PardeeCalaveras2479,612
KerckhoffFresno23n/a
Dutch FlatPlacer2265,986
GrizzlyPlumas2243,251
Terminus Hydroelectric ProjectTulare2033,125
El DoradoEl Dorado2080,546
Drop 4Imperial2074,860

Source: EIA Forms EIA-860 and EIA-923, 2025.