Hydro power plant, California
Terminus Hydroelectric Project, California
Terminus Hydroelectric Project is a 20.1 MW hydro power plant in Tulare County, California, operated by Eagle Creek Renewable Energy, LLC, and it generated 33,125 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 18th percentile of U.S. hydro plants. By 2025 generation it ranks 4,615th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Terminus Hydroelectric Project plant run compared with other hydro plants?
The Terminus Hydroelectric Project plant had a capacity factor of 19% in 2025 on 20 MW of net summer capacity, the 18th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 69 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Terminus Hydroelectric Project | 19% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Terminus Hydroelectric Project plant generating more or less than last year?
Terminus Hydroelectric Project generated 33,125 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 3 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 9,790 |
| 2025 | 33,125 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 126 |
| November 2025 | 0 |
| October 2025 | 0 |
| September 2025 | 0 |
| August 2025 | 780 |
| July 2025 | 9,370 |
| June 2025 | 12,920 |
| May 2025 | 6,936 |
| April 2025 | 1,431 |
| March 2025 | 1,562 |
| February 2025 | 0 |
| January 2025 | 0 |
| December 2024 | 0 |
| November 2024 | 0 |
| October 2024 | 0 |
| September 2024 | 0 |
| August 2024 | 0 |
| July 2024 | 0 |
| June 2024 | 5,697 |
| May 2024 | 0 |
| April 2024 | 0 |
| March 2024 | 1,460 |
| February 2024 | 2,633 |
| January 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Terminus Hydroelectric Project plant, and when do they retire?
1 operable generator totals 20.1 MW, with an average age of 35 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Conventional Hydroelectric | 20 | 1990 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Terminus Hydroelectric Project plant?
Terminus Hydroelectric, LLC is the only joint owner reported for Terminus Hydroelectric Project, with 100.0%. Eagle Creek Renewable Energy, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Terminus Hydroelectric Project plant?
Terminus Hydroelectric Project is in Lemon Cove, Tulare County, California, at 36.4156° N, 119.0069° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in California are similar in size?
California has 238 operable hydro plants with 9,936 MW of capacity, and Terminus Hydroelectric Project's 20.1 MW is 0% of that.
Source: EIA Forms EIA-860 and EIA-923, 2025.