Skip to main content
RateWatt

Natural gas power plant, Ohio

Guernsey Power Station, Ohio

Guernsey Power Station is a 2,055 MW natural gas power plant in Guernsey County, Ohio, operated by Guernsey Power Station LLC, and it generated 11,309,051 MWh in 2025 (Forms EIA-860 and EIA-923). That is 7.8% of the generation reported in Ohio, and its capacity factor sits at the 87th percentile of U.S. natural gas plants. By 2025 generation it ranks 52nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

2,055 MWNameplate capacity
72%Capacity factor, 2025, 87th percentile, on 1,789 MW net summer
7.8%Of OH generation, 2025
2 yearsAverage generator age, by MW

How hard does Guernsey Power Station run compared with other natural gas plants?

Guernsey Power Station had a capacity factor of 72% in 2025 on 1,789 MW of net summer capacity, the 87th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 263 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Guernsey Power Station72%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Guernsey Power Station generating more or less than last year?

Generation at Guernsey Power Station fell 2.6% from 2024 to 2025, from 11,615,196 MWh to 11,309,051 MWh. Through August 2026 it is running 12.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202411,615,196
202511,309,051
2026 through August8,872,036
2025, same months7,899,916
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20261,286,625
July 20261,279,611
June 20261,105,936
May 20261,058,956
April 2026615,715
March 20261,281,259
February 20261,003,381
January 20261,240,553
December 20251,288,590
November 2025776,859
October 2025216,614
September 20251,127,072
August 20251,209,351
July 20251,225,545
June 2025888,300
May 20251,130,922
April 2025318,154
March 20251,202,377
February 2025763,641
January 20251,161,626
December 20241,238,793
November 2024925,251
October 2024222,326
September 20241,149,521
August 20241,137,699
July 20241,099,027
June 20241,145,385
May 20241,147,255
April 2024290,292
March 20241,236,980
February 20241,176,777
January 2024845,890

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from Guernsey Power Station?

Guernsey Power Station made 7.8% of the 145,060,499 MWh reported by Ohio plants in 2025, from 6.0% of the state's 34,392 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 2nd largest of 215 plants in Ohio, the 65th largest of 14,327 in the U.S. and the 17th largest of 1,962 natural gas plants. By 2025 generation it is the 2nd largest of 187 generating plants in the state.

Guernsey Power Station within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)2,05534,3926.0%
Generation (MWh)11,309,051145,060,4997.8%
Natural gas capacity (MW)2,05518,39811.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Guernsey Power Station, and when do they retire?

3 operable generators total 2,055 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s32,055100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GPS1OperatingNatural Gas Fired Combined Cycle6852023n/a
GPS2OperatingNatural Gas Fired Combined Cycle6852023n/a
GPS3OperatingNatural Gas Fired Combined Cycle6852023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Guernsey Power Station?

EIA lists no joint owners for Guernsey Power Station. Guernsey Power Station LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Guernsey Power Station?

Guernsey Power Station is in Byesville, Guernsey County, Ohio, at 39.9364° N, 81.5354° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Ohio are similar in size?

Ohio has 47 operable natural gas plants with 18,398 MW of capacity, and Guernsey Power Station's 2,055 MW is 11% of that.

Natural gas plants in Ohio around this size
PlantCountyMW2025 MWh
Guernsey Power StationGuernsey2,05511,309,051
Hanging Rock Energy FacilityLawrence1,43010,201,773
South Field EnergyColumbiana1,2107,218,175
Oregon Clean Energy CenterLucas1,0605,609,595

Source: EIA Forms EIA-860 and EIA-923, 2025.