H B Robinson is a 769 MW nuclear power plant in Darlington County, South Carolina, operated by Duke Energy Progress-(NC), and it generated 6,721,389 MWh in 2025 (Forms EIA-860 and EIA-923). That is 6.5% of the generation reported in South Carolina, and its capacity factor sits at the 96th percentile of U.S. nuclear plants. By 2025 generation it ranks 148th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

769 MWNameplate capacity
101%Capacity factor, 2025, 96th percentile, on 759 MW net summer
6.5%Of SC generation, 2025
54 yearsAverage generator age, by MW

How hard does the H B Robinson plant run compared with other nuclear plants?

The H B Robinson plant had a capacity factor of 101% in 2025 on 759 MW of net summer capacity, the 96th percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 369 days at full output out of 365.

0%Shaded: the middle half of nuclear plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
H B Robinson101%
Nuclear plants, 75th percentile97%
Nuclear plants, median95%
Nuclear plants, 25th percentile90%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. A factor above 100% means the units ran above their summer rating over the year. Values above 105% are left out of the comparison.

Is the H B Robinson plant generating more or less than last year?

Generation at H B Robinson rose 8.7% from 2024 to 2025, from 6,185,306 MWh to 6,721,389 MWh. Through August 2026 it is running 1.3% behind the same months of 2025.

Net generation by period
PeriodMWh
20246,185,306
20256,721,389
2026 through August4,400,530
2025, same months4,457,427
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026546,454
July 2026545,687
June 2026533,515
May 2026561,595
April 2026548,171
March 2026569,498
February 2026519,518
January 2026576,092
December 2025576,170
November 2025559,022
October 2025575,985
September 2025552,785
August 2025556,363
July 2025562,488
June 2025517,615
May 2025573,493
April 2025557,972
March 2025581,539
February 2025523,291
January 2025584,666
December 2024459,004
November 202472,471
October 2024576,375
September 2024554,238
August 2024568,191
July 2024563,174
June 2024548,472
May 2024575,502
April 2024561,609
March 2024581,487
February 2024544,668
January 2024580,115

Source: EIA Form EIA-923, through August 2026.

How much of South Carolina's electricity comes from the H B Robinson plant?

H B Robinson made 6.5% of the 103,930,530 MWh reported by South Carolina plants in 2025, from 2.8% of the state's 27,220 MW of capacity. Its share of output is 2.3 times its share of capacity. By capacity it is the 14th largest of 215 plants in South Carolina, the 438th largest of 14,327 in the U.S. and the 54th largest of 56 nuclear plants. By 2025 generation it is the 5th largest of 197 generating plants in the state.

H B Robinson within South Carolina, 2025
MeasureThis plantSouth CarolinaShare
Capacity (MW)76927,2202.8%
Generation (MWh)6,721,389103,930,5306.5%
Nuclear capacity (MW)7696,87511.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the H B Robinson plant, and when do they retire?

1 operable generator totals 769 MW, with an average age of 54 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 223 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s1769100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2OperatingNuclear7691971n/a
1RetiredConventional Steam Coal20719602012
GT1RetiredNatural Gas Fired Combustion Turbine1619682013

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the H B Robinson plant?

EIA lists no joint owners for H B Robinson. Duke Energy Progress-(NC) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Progress charge homes?

Duke Energy Progress, the operator of H B Robinson, had an average residential price of 14.09¢ per kWh and an average bill of $170 a month in 2025, 7% below the South Carolina average of 15.12¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst South Carolina
Duke Energy Progress14.09¢$1707% lower
South Carolina average15.12¢$161
U.S. average17.23¢$15114% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the H B Robinson plant?

H B Robinson is in Hartsville, Darlington County, South Carolina, at 34.4017° N, 80.1589° W. It sits in the Duke Energy Progress East balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which nuclear plants in South Carolina are similar in size?

South Carolina has 4 operable nuclear plants with 6,875 MW of capacity, and H B Robinson's 769 MW is 11% of that.

Nuclear plants in South Carolina around this size
PlantCountyMW2025 MWh
V C SummerFairfield1,0308,114,558
H B RobinsonDarlington7696,721,389

Source: EIA Forms EIA-860 and EIA-923, 2025.