Nuclear power plant, South Carolina

V C Summer nuclear power plant, South Carolina

V C Summer is a 1,030 MW nuclear power plant in Fairfield County, South Carolina, operated by Dominion Energy South Carolina, Inc, and it generated 8,114,558 MWh in 2025 (Forms EIA-860 and EIA-923). That is 7.8% of the generation reported in South Carolina, and its capacity factor sits at the 46th percentile of U.S. nuclear plants. By 2025 generation it ranks 99th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,030 MWNameplate capacity
95%Capacity factor, 2025, 46th percentile, on 977 MW net summer
7.8%Of SC generation, 2025
41 yearsAverage generator age, by MW

How hard does the V C Summer plant run compared with other nuclear plants?

The V C Summer plant had a capacity factor of 95% in 2025 on 977 MW of net summer capacity, the 46th percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 346 days at full output out of 365.

0%Shaded: the middle half of nuclear plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
V C Summer95%
Nuclear plants, 75th percentile97%
Nuclear plants, median95%
Nuclear plants, 25th percentile90%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the V C Summer plant generating more or less than last year?

V C Summer generated 8,114,558 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 22.8% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
20247,421,166
20258,114,558
2026 through August4,403,021
2025, same months5,703,645
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026720,535
July 2026723,269
June 2026703,915
May 2026730,760
April 2026430,065
March 20260
February 2026382,544
January 2026711,933
December 2025737,114
November 2025711,813
October 2025254,881
September 2025707,105
August 2025719,583
July 2025757,004
June 2025708,650
May 2025736,564
April 2025714,920
March 2025737,042
February 2025593,996
January 2025735,886
December 2024735,431
November 2024463,383
October 20240
September 2024453,703
August 2024725,741
July 2024724,131
June 2024706,560
May 2024735,059
April 2024713,627
March 2024736,297
February 2024689,888
January 2024737,346

Source: EIA Form EIA-923, through August 2026.

How much of South Carolina's electricity comes from the V C Summer plant?

V C Summer made 7.8% of the 103,930,530 MWh reported by South Carolina plants in 2025, from 3.8% of the state's 27,220 MW of capacity. Its share of output is 2.1 times its share of capacity. By capacity it is the 8th largest of 215 plants in South Carolina, the 297th largest of 14,327 in the U.S. and the 47th largest of 56 nuclear plants. By 2025 generation it is the 4th largest of 197 generating plants in the state.

V C Summer within South Carolina, 2025
MeasureThis plantSouth CarolinaShare
Capacity (MW)1,03027,2203.8%
Generation (MWh)8,114,558103,930,5307.8%
Nuclear capacity (MW)1,0306,87515.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the V C Summer plant, and when do they retire?

1 operable generator totals 1,030 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s11,030100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNuclear1,0301984n/a
2CancelledNuclear1,100n/an/a
3CancelledNuclear1,100n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the V C Summer plant?

2 owners report shares in V C Summer; Dominion Energy South Carolina, Inc holds the largest named share, 66.7% or about 686 MW. Dominion Energy South Carolina, Inc operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Dominion Energy South Carolina, Inc66.7%6865,409,976
South Carolina Public Service Authority33.3%3432,704,582

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What does Dominion Energy South Carolina, Inc charge homes?

Dominion Energy South Carolina, Inc, the operator of V C Summer, had an average residential price of 16.41¢ per kWh and an average bill of $169 a month in 2025, 9% above the South Carolina average of 15.12¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst South Carolina
Dominion Energy South Carolina, Inc16.41¢$1699% higher
South Carolina average15.12¢$161
U.S. average17.23¢$15114% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the V C Summer plant?

V C Summer is in Jenkinsville, Fairfield County, South Carolina, at 34.2983° N, 81.3153° W. It sits in the Dominion Energy South Carolina balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which nuclear plants in South Carolina are similar in size?

South Carolina has 4 operable nuclear plants with 6,875 MW of capacity, and V C Summer's 1,030 MW is 15% of that.

Nuclear plants in South Carolina around this size
PlantCountyMW2025 MWh
V C SummerFairfield1,0308,114,558
H B RobinsonDarlington7696,721,389

Source: EIA Forms EIA-860 and EIA-923, 2025.