Skip to main content
RateWatt

Solar power plant, North Carolina

Halifax solar power plant, North Carolina

Halifax (NC) is a 20 MW solar power plant in Halifax County, North Carolina, operated by Deriva Energy, and it generated 33,378 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 20th percentile of U.S. solar plants. By 2025 generation it ranks 4,598th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
19%Capacity factor, 2025, 20th percentile, on 20 MW net summer
4,598thU.S. rank by generation, 2025
11 yearsAverage generator age, by MW

How hard does the Halifax (NC) plant run compared with other solar plants?

The Halifax (NC) plant had a capacity factor of 19% in 2025 on 20 MW of net summer capacity, the 20th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 70 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Halifax (NC)19%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Halifax (NC) plant generating more or less than last year?

Generation at Halifax (NC) rose 37.9% from 2024 to 2025, from 24,211 MWh to 33,378 MWh.

Net generation by period
PeriodMWh
202424,211
202533,378
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,967
November 20252,709
October 20252,762
September 20252,734
August 20253,289
July 20253,795
June 20253,924
May 20253,392
April 20253,319
March 20252,559
February 20251,256
January 20251,672
December 2024880
November 20241,611
October 20242,304
September 20241,482
August 20242,570
July 20242,531
June 20242,756
May 20241,035
April 20242,023
March 20242,707
February 20242,366
January 20241,946

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Halifax (NC) plant?

Halifax (NC) made 0.0% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.1% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 119th largest of 928 plants in North Carolina, the 4,775th largest of 14,327 in the U.S. and the 1,108th largest of 7,223 solar plants. By 2025 generation it is the 123rd largest of 872 generating plants in the state.

Halifax (NC) within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)2039,9330.1%
Generation (MWh)33,378134,194,4340.0%
Solar capacity (MW)207,0250.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Halifax (NC) plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic202014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Halifax (NC) plant?

EIA lists no joint owners for Halifax (NC). Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Halifax (NC) plant?

Halifax (NC) is in Roanoke Rapids, Halifax County, North Carolina, at 36.4419° N, 77.7114° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Halifax (NC)'s 20 MW is 0% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
Montgomery Solar LLCMontgomery2036,348
Apple Data Center - PV2Catawba2034,464
Dogwood Solar, LLCHalifax2027,335
Halifax (NC)Halifax2033,378
Watson Seed Farm PV1Nash2029,849
Shawboro PV1Currituck2034,891
Meadows PV 1Martin2016,404

Source: EIA Forms EIA-860 and EIA-923, 2025.