Hancock Wind Plant, Maine
Hancock Wind Plant is a 51 MW wind power plant in Hancock County, Maine, operated by Onward Energy, and it generated 120,358 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Maine, and its capacity factor sits at the 28th percentile of U.S. wind plants. By 2025 generation it ranks 3,191st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Hancock Wind Plant run compared with other wind plants?
Hancock Wind Plant had a capacity factor of 27% in 2025 on 51 MW of net summer capacity, the 28th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 98 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Hancock Wind Plant | 27% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Hancock Wind Plant generating more or less than last year?
Generation at Hancock Wind Plant rose 2.7% from 2024 to 2025, from 117,247 MWh to 120,358 MWh. Through August 2026 it is running 6.4% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 117,247 |
| 2025 | 120,358 |
| 2026 through August | 70,846 |
| 2025, same months | 75,689 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 5,494 |
| July 2026 | 8,344 |
| June 2026 | 6,248 |
| May 2026 | 10,342 |
| April 2026 | 9,660 |
| March 2026 | 12,334 |
| February 2026 | 6,169 |
| January 2026 | 12,255 |
| December 2025 | 15,643 |
| November 2025 | 13,758 |
| October 2025 | 9,965 |
| September 2025 | 5,303 |
| August 2025 | 4,651 |
| July 2025 | 5,798 |
| June 2025 | 6,609 |
| May 2025 | 7,276 |
| April 2025 | 9,484 |
| March 2025 | 11,076 |
| February 2025 | 14,499 |
| January 2025 | 16,296 |
| December 2024 | 12,390 |
| November 2024 | 17,398 |
| October 2024 | 10,376 |
| September 2024 | 4,967 |
| August 2024 | 3,901 |
| July 2024 | 4,659 |
| June 2024 | 6,170 |
| May 2024 | 4,619 |
| April 2024 | 12,003 |
| March 2024 | 15,242 |
| February 2024 | 13,489 |
| January 2024 | 12,033 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Hancock Wind Plant, and when do they retire?
1 operable generator totals 51 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 51 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HANC1 | Operating | Onshore Wind Turbine | 51 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Hancock Wind Plant?
EIA lists no joint owners for Hancock Wind Plant. Onward Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Hancock Wind Plant?
Hancock Wind Plant is in T22 MD, Hancock County, Maine, at 44.7608° N, 68.1469° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Maine are similar in size?
Maine has 22 operable wind plants with 1,217 MW of capacity, and Hancock Wind Plant's 51 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Rollins Wind Project | Penobscot | 60 | 146,628 |
| Moscow | Somerset | 59 | 43,028 |
| Stetson Wind I | Washington | 57 | 145,940 |
| Hancock Wind Plant | Hancock | 51 | 120,358 |
| Record Hill Wind | Oxford | 51 | 110,189 |
| Passadumkeag Windpark LLC | Penobscot | 43 | 140,618 |
| Mars Hill Wind Farm Project | Aroostook | 42 | 128,290 |
Source: EIA Forms EIA-860 and EIA-923, 2025.