Wind power plant, Maine
Passadumkeag Windpark LLC wind power plant, Maine
Passadumkeag Windpark LLC is a 42.9 MW wind power plant in Penobscot County, Maine, operated by Southern Power Co, and it generated 140,618 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Maine, and its capacity factor sits at the 74th percentile of U.S. wind plants. By 2025 generation it ranks 3,003rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Passadumkeag Windpark LLC plant run compared with other wind plants?
The Passadumkeag Windpark LLC plant had a capacity factor of 40% in 2025 on 39.9 MW of net summer capacity, the 74th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 147 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Passadumkeag Windpark LLC | 40% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Passadumkeag Windpark LLC plant generating more or less than last year?
Generation at Passadumkeag Windpark LLC rose 10.0% from 2024 to 2025, from 127,803 MWh to 140,618 MWh. Through August 2026 it is running 7.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 127,803 |
| 2025 | 140,618 |
| 2026 through August | 84,538 |
| 2025, same months | 90,910 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 7,200 |
| July 2026 | 8,139 |
| June 2026 | 7,061 |
| May 2026 | 10,685 |
| April 2026 | 11,844 |
| March 2026 | 13,602 |
| February 2026 | 12,910 |
| January 2026 | 13,097 |
| December 2025 | 15,826 |
| November 2025 | 13,106 |
| October 2025 | 12,637 |
| September 2025 | 8,139 |
| August 2025 | 8,183 |
| July 2025 | 8,416 |
| June 2025 | 9,443 |
| May 2025 | 9,861 |
| April 2025 | 10,995 |
| March 2025 | 14,946 |
| February 2025 | 14,176 |
| January 2025 | 14,890 |
| December 2024 | 11,742 |
| November 2024 | 17,506 |
| October 2024 | 12,003 |
| September 2024 | 6,431 |
| August 2024 | 5,921 |
| July 2024 | 6,400 |
| June 2024 | 8,511 |
| May 2024 | 7,121 |
| April 2024 | 12,034 |
| March 2024 | 14,774 |
| February 2024 | 13,920 |
| January 2024 | 11,440 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Passadumkeag Windpark LLC plant, and when do they retire?
1 operable generator totals 42.9 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 43 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| Q357 | Operating | Onshore Wind Turbine | 43 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Passadumkeag Windpark LLC plant?
Passadumkeag Windpark LLC is the only joint owner reported for Passadumkeag Windpark LLC, with 100.0%. Southern Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Passadumkeag Windpark LLC plant?
Passadumkeag Windpark LLC is in Greenbush, Penobscot County, Maine, at 45.0700° N, 68.2100° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Maine are similar in size?
Maine has 22 operable wind plants with 1,217 MW of capacity, and Passadumkeag Windpark LLC's 42.9 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Stetson Wind I | Washington | 57 | 145,940 |
| Hancock Wind Plant | Hancock | 51 | 120,358 |
| Record Hill Wind | Oxford | 51 | 110,189 |
| Passadumkeag Windpark LLC | Penobscot | 43 | 140,618 |
| Mars Hill Wind Farm Project | Aroostook | 42 | 128,290 |
| Bull Hill Wind Project | Hancock | 35 | 66,494 |
| Saddleback Ridge Wind Farm | Franklin | 34 | 90,411 |
Source: EIA Forms EIA-860 and EIA-923, 2025.