Skip to main content
RateWatt

Solar power plant, Texas

Hayhurst Texas Solar power plant, Texas

Hayhurst Texas Solar is a 24.8 MW solar power plant in Culberson County, Texas, operated by Hayhurst Texas Solar, and it generated 70,129 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 97th percentile of U.S. solar plants. By 2025 generation it ranks 3,759th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

24.8 MWNameplate capacity
32%Capacity factor, 2025, 97th percentile, on 24.8 MW net summer
3,759thU.S. rank by generation, 2025
1 yearAverage generator age, by MW

How hard does the Hayhurst Texas Solar plant run compared with other solar plants?

The Hayhurst Texas Solar plant had a capacity factor of 32% in 2025 on 24.8 MW of net summer capacity, the 97th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 118 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hayhurst Texas Solar32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hayhurst Texas Solar plant generating more or less than last year?

Generation at Hayhurst Texas Solar rose 9.5% from 2024 to 2025, from 64,026 MWh to 70,129 MWh.

Net generation by period
PeriodMWh
202464,026
202570,129
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20254,035
November 20254,850
October 20255,769
September 20255,980
August 20256,813
July 20257,651
June 20255,910
May 20257,502
April 20256,342
March 20255,777
February 20255,157
January 20254,343
December 20243,997
November 20244,607
October 20245,630
September 20246,309
August 20247,862
July 20247,370
June 20246,484
May 20247,442
April 20245,736
March 20245,333
February 20241,668
January 20241,588

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Hayhurst Texas Solar plant?

Hayhurst Texas Solar made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.0% of the state's 195,966 MW of capacity. By capacity it is the 638th largest of 1,023 plants in Texas, the 4,591st largest of 14,327 in the U.S. and the 1,057th largest of 7,223 solar plants. By 2025 generation it is the 518th largest of 816 generating plants in the state.

Hayhurst Texas Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)25195,9660.0%
Generation (MWh)70,129592,896,1760.0%
Solar capacity (MW)2530,7390.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hayhurst Texas Solar plant, and when do they retire?

1 operable generator totals 24.8 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s125100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HHTXOperatingSolar Photovoltaic252024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hayhurst Texas Solar plant?

2 owners report shares in Hayhurst Texas Solar; Algonquin Power Fund (America) Inc. holds the largest named share, 50.0% or about 12.4 MW. Hayhurst Texas Solar operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Algonquin Power Fund (America) Inc.50.0%1235,065
Chevron Renewable Investments, LLC50.0%1235,065

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Hayhurst Texas Solar plant?

Hayhurst Texas Solar is in Orla, Culberson County, Texas, at 31.8160° N, 104.0853° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Hayhurst Texas Solar's 24.8 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Webberville Solar ProjectTravis3056,362
Bluebell SolarSterling3071,759
Oberon IBEctor3061,946
Hayhurst Texas SolarCulberson2570,129
Oxy Renewable Energy - GoldsmithEctor1738,798
Phantom SolarBell158,079
Blue Wing Solar Energy GenerationBexar1419,543

Source: EIA Forms EIA-860 and EIA-923, 2025.