Skip to main content
RateWatt

Solar power plant, New York

Hecate Energy Albany County 1 solar power plant, New York

Hecate Energy Albany County 1 is a 20 MW solar power plant in Albany County, New York, operated by Greenbacker Renewable Energy Corporation, and it generated 27,468 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 13th percentile of U.S. solar plants. By 2025 generation it ranks 4,853rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
16%Capacity factor, 2025, 13th percentile, on 20 MW net summer
4,853rdU.S. rank by generation, 2025
1 yearAverage generator age, by MW

How hard does the Hecate Energy Albany County 1 plant run compared with other solar plants?

The Hecate Energy Albany County 1 plant had a capacity factor of 16% in 2025 on 20 MW of net summer capacity, the 13th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 57 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hecate Energy Albany County 116%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hecate Energy Albany County 1 plant generating more or less than last year?

Hecate Energy Albany County 1 generated 27,468 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
202426,540
202527,468
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025879
November 2025918
October 20251,856
September 20253,246
August 20253,063
July 20251,097
June 20254,002
May 20252,944
April 20253,412
March 20253,030
February 20251,785
January 20251,236
December 2024910
November 20241,678
October 20242,879
September 20243,551
August 20242,411
July 20244,018
June 20243,994
May 20243,555
April 20242,765
March 2024779
February 20240
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of New York's electricity comes from the Hecate Energy Albany County 1 plant?

Hecate Energy Albany County 1 made 0.0% of the 130,607,810 MWh reported by New York plants in 2025, from 0.0% of the state's 44,194 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 152nd largest of 1,145 plants in New York, the 4,775th largest of 14,327 in the U.S. and the 1,231st largest of 7,223 solar plants. By 2025 generation it is the 187th largest of 1,049 generating plants in the state.

Hecate Energy Albany County 1 within New York, 2025
MeasureThis plantNew YorkShare
Capacity (MW)2044,1940.0%
Generation (MWh)27,468130,607,8100.0%
Solar capacity (MW)203,1160.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hecate Energy Albany County 1 plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ALBNYOperatingSolar Photovoltaic202024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hecate Energy Albany County 1 plant?

EIA lists no joint owners for Hecate Energy Albany County 1. Greenbacker Renewable Energy Corporation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hecate Energy Albany County 1 plant?

Hecate Energy Albany County 1 is in Coeymans, Albany County, New York, at 42.5155° N, 73.8334° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New York are similar in size?

New York has 718 operable solar plants with 3,116 MW of capacity, and Hecate Energy Albany County 1's 20 MW is 1% of that.

Solar plants in New York around this size
PlantCountyMW2025 MWh
Calverton Solar Energy CenterSuffolk2341,724
Hecate Energy Albany 2 LLCAlbany2130,270
Riverhead Solar FarmSuffolk2033,414
Hecate Energy Albany County 1Albany2027,468
NY8 - Grissom SolarMontgomery2035,947
NY8 - Branscomb SolarRensselaer2034,337
NY8 - Janis SolarCortland2030,969

Source: EIA Forms EIA-860 and EIA-923, 2025.