Solar power plant, New York
Riverhead Solar Farm, New York
Riverhead Solar Farm is a 20 MW solar power plant in Suffolk County, New York, operated by AES Distributed Energy, and it generated 33,414 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 20th percentile of U.S. solar plants. By 2025 generation it ranks 4,596th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Riverhead Solar Farm plant run compared with other solar plants?
The Riverhead Solar Farm plant had a capacity factor of 19% in 2025 on 20 MW of net summer capacity, the 20th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 70 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Riverhead Solar Farm | 19% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Riverhead Solar Farm plant generating more or less than last year?
Generation at Riverhead Solar Farm rose 1.4% from 2024 to 2025, from 32,942 MWh to 33,414 MWh.
| Period | MWh |
|---|---|
| 2024 | 32,942 |
| 2025 | 33,414 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,050 |
| November 2025 | 1,505 |
| October 2025 | 2,443 |
| September 2025 | 3,108 |
| August 2025 | 4,196 |
| July 2025 | 3,930 |
| June 2025 | 3,919 |
| May 2025 | 3,507 |
| April 2025 | 3,326 |
| March 2025 | 2,925 |
| February 2025 | 2,011 |
| January 2025 | 1,494 |
| December 2024 | 1,327 |
| November 2024 | 1,759 |
| October 2024 | 2,836 |
| September 2024 | 2,864 |
| August 2024 | 3,603 |
| July 2024 | 3,559 |
| June 2024 | 4,615 |
| May 2024 | 3,413 |
| April 2024 | 3,129 |
| March 2024 | 2,801 |
| February 2024 | 2,066 |
| January 2024 | 970 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Riverhead Solar Farm plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RIV1 | Operating | Solar Photovoltaic | 20 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Riverhead Solar Farm plant?
EIA lists no joint owners for Riverhead Solar Farm. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Riverhead Solar Farm plant?
Riverhead Solar Farm is in Calverton, Suffolk County, New York, at 40.9230° N, 72.7645° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in New York are similar in size?
New York has 718 operable solar plants with 3,116 MW of capacity, and Riverhead Solar Farm's 20 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Shoreham Solar Commons | Suffolk | 25 | 44,096 |
| Calverton Solar Energy Center | Suffolk | 23 | 41,724 |
| Hecate Energy Albany 2 LLC | Albany | 21 | 30,270 |
| Riverhead Solar Farm | Suffolk | 20 | 33,414 |
| Hecate Energy Albany County 1 | Albany | 20 | 27,468 |
| NY8 - Grissom Solar | Montgomery | 20 | 35,947 |
| NY8 - Branscomb Solar | Rensselaer | 20 | 34,337 |
Source: EIA Forms EIA-860 and EIA-923, 2025.