High Lonesome Wind Power, LLC Hybrid is a 563 MW power plant, 500 MW of it wind, in Upton County, Texas, operated by High Lonesome Wind Power, LLC, and it generated 1,265,797 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 35th percentile of U.S. wind plants. By 2025 generation it ranks 647th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the High Lonesome Wind Power, LLC Hybrid plant run compared with other wind plants?
The High Lonesome Wind Power, LLC Hybrid plant's wind units had a capacity factor of 29% in 2025 on 500 MW of net summer capacity, the 35th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 106 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| High Lonesome Wind Power, LLC Hybrid | 29% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.
Is the High Lonesome Wind Power, LLC Hybrid plant generating more or less than last year?
Generation at High Lonesome Wind Power, LLC Hybrid rose 7.1% from 2024 to 2025, from 1,181,360 MWh to 1,265,797 MWh. Through August 2026 it is running 38.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,181,360 |
| 2025 | 1,265,797 |
| 2026 through August | 1,130,300 |
| 2025, same months | 813,803 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 135,689 |
| July 2026 | 142,253 |
| June 2026 | 173,174 |
| May 2026 | 142,570 |
| April 2026 | 147,956 |
| March 2026 | 170,982 |
| February 2026 | 115,619 |
| January 2026 | 102,057 |
| December 2025 | 113,264 |
| November 2025 | 114,039 |
| October 2025 | 132,670 |
| September 2025 | 92,021 |
| August 2025 | 83,749 |
| July 2025 | 112,568 |
| June 2025 | 137,585 |
| May 2025 | 86,068 |
| April 2025 | 122,699 |
| March 2025 | 106,361 |
| February 2025 | 84,632 |
| January 2025 | 80,141 |
| December 2024 | 94,092 |
| November 2024 | 92,166 |
| October 2024 | 107,631 |
| September 2024 | 62,280 |
| August 2024 | 83,913 |
| July 2024 | 92,151 |
| June 2024 | 124,520 |
| May 2024 | 104,710 |
| April 2024 | 120,146 |
| March 2024 | 102,475 |
| February 2024 | 109,392 |
| January 2024 | 87,884 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the High Lonesome Wind Power, LLC Hybrid plant, and when do they retire?
3 operable generators total 563 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 3 | 563 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BA | Operating | Batteries | 63 | 2023 | n/a |
| HILO | Operating | Onshore Wind Turbine | 450 | 2023 | n/a |
| HILO2 | Operating | Onshore Wind Turbine | 50 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the High Lonesome Wind Power, LLC Hybrid plant?
EIA lists no joint owners for High Lonesome Wind Power, LLC Hybrid. High Lonesome Wind Power, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the High Lonesome Wind Power, LLC Hybrid plant use?
High Lonesome Wind Power, LLC Hybrid has capacity on 2 fuels: 89% wind and 11% battery and pumped storage. In 2025, wind made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Wind | 500 | 88.8% | 1,265,797 |
| Battery and pumped storage | 63 | 11.2% | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the High Lonesome Wind Power, LLC Hybrid plant?
High Lonesome Wind Power, LLC Hybrid is in Rankin, Upton County, Texas, at 31.1717° N, 101.8811° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and High Lonesome Wind Power, LLC Hybrid's 500 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Aviator Wind | Coke | 525 | 1,698,071 |
| White Mesa Wind | Crockett | 501 | 1,801,804 |
| Young Wind | Young | 500 | 1,569,063 |
| High Lonesome Wind Power, LLC Hybrid | Upton | 500 | 1,265,797 |
| Maverick Creek Wind | Concho | 492 | 1,555,334 |
| Hale Community Wind Farm | Hale | 478 | 1,936,494 |
| Mesquite Star | Nolan | 419 | 1,150,168 |