Maverick Creek Wind power plant, Texas

Maverick Creek Wind is a 492 MW wind power plant in Concho County, Texas, operated by Algonquin Power Co, and it generated 1,555,334 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Texas, and its capacity factor sits at the 60th percentile of U.S. wind plants. By 2025 generation it ranks 588th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

492 MWNameplate capacity
36%Capacity factor, 2025, 60th percentile, on 492 MW net summer
0.3%Of TX generation, 2025
3 yearsAverage generator age, by MW

How hard does the Maverick Creek Wind plant run compared with other wind plants?

The Maverick Creek Wind plant had a capacity factor of 36% in 2025 on 492 MW of net summer capacity, the 60th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 132 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Maverick Creek Wind36%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Maverick Creek Wind plant generating more or less than last year?

Generation at Maverick Creek Wind rose 13.8% from 2024 to 2025, from 1,366,201 MWh to 1,555,334 MWh. Through August 2026 it is running 18.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20241,366,201
20251,555,334
2026 through August1,199,170
2025, same months1,015,921
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026127,316
July 2026135,241
June 2026173,998
May 2026138,260
April 2026140,460
March 2026212,958
February 2026146,025
January 2026124,912
December 2025160,725
November 2025141,923
October 2025136,834
September 202599,931
August 202594,901
July 2025118,982
June 2025159,809
May 2025105,660
April 2025150,137
March 2025150,897
February 2025111,915
January 2025123,620
December 2024116,484
November 2024132,304
October 2024125,666
September 202463,267
August 202494,954
July 202493,234
June 2024122,847
May 2024109,804
April 2024139,334
March 2024120,867
February 2024135,370
January 2024112,070

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Maverick Creek Wind plant?

Maverick Creek Wind made 0.3% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.3% of the state's 195,966 MW of capacity. By capacity it is the 99th largest of 1,023 plants in Texas, the 750th largest of 14,327 in the U.S. and the 19th largest of 1,358 wind plants. By 2025 generation it is the 88th largest of 816 generating plants in the state.

Maverick Creek Wind within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)492195,9660.3%
Generation (MWh)1,555,334592,896,1760.3%
Wind capacity (MW)49243,9421.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Maverick Creek Wind plant, and when do they retire?

1 operable generator totals 492 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1492100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MVRCKOperatingOnshore Wind Turbine4922022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Maverick Creek Wind plant?

EIA lists no joint owners for Maverick Creek Wind. Algonquin Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Maverick Creek Wind plant?

Maverick Creek Wind is in Eden, Concho County, Texas, at 31.2625° N, 99.8440° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Maverick Creek Wind's 492 MW is 1% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
White Mesa WindCrockett5011,801,804
Young WindYoung5001,569,063
High Lonesome Wind Power, LLC HybridUpton5001,265,797
Maverick Creek WindConcho4921,555,334
Hale Community Wind FarmHale4781,936,494
Mesquite StarNolan4191,150,168
Stephens Ranch Wind Energy LLCBorden376896,710

Source: EIA Forms EIA-860 and EIA-923, 2025.