Wind power plant, Texas
Maverick Creek Wind power plant, Texas
Maverick Creek Wind is a 492 MW wind power plant in Concho County, Texas, operated by Algonquin Power Co, and it generated 1,555,334 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Texas, and its capacity factor sits at the 60th percentile of U.S. wind plants. By 2025 generation it ranks 588th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Maverick Creek Wind plant run compared with other wind plants?
The Maverick Creek Wind plant had a capacity factor of 36% in 2025 on 492 MW of net summer capacity, the 60th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 132 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Maverick Creek Wind | 36% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Maverick Creek Wind plant generating more or less than last year?
Generation at Maverick Creek Wind rose 13.8% from 2024 to 2025, from 1,366,201 MWh to 1,555,334 MWh. Through August 2026 it is running 18.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,366,201 |
| 2025 | 1,555,334 |
| 2026 through August | 1,199,170 |
| 2025, same months | 1,015,921 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 127,316 |
| July 2026 | 135,241 |
| June 2026 | 173,998 |
| May 2026 | 138,260 |
| April 2026 | 140,460 |
| March 2026 | 212,958 |
| February 2026 | 146,025 |
| January 2026 | 124,912 |
| December 2025 | 160,725 |
| November 2025 | 141,923 |
| October 2025 | 136,834 |
| September 2025 | 99,931 |
| August 2025 | 94,901 |
| July 2025 | 118,982 |
| June 2025 | 159,809 |
| May 2025 | 105,660 |
| April 2025 | 150,137 |
| March 2025 | 150,897 |
| February 2025 | 111,915 |
| January 2025 | 123,620 |
| December 2024 | 116,484 |
| November 2024 | 132,304 |
| October 2024 | 125,666 |
| September 2024 | 63,267 |
| August 2024 | 94,954 |
| July 2024 | 93,234 |
| June 2024 | 122,847 |
| May 2024 | 109,804 |
| April 2024 | 139,334 |
| March 2024 | 120,867 |
| February 2024 | 135,370 |
| January 2024 | 112,070 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Maverick Creek Wind plant, and when do they retire?
1 operable generator totals 492 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 492 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MVRCK | Operating | Onshore Wind Turbine | 492 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Maverick Creek Wind plant?
EIA lists no joint owners for Maverick Creek Wind. Algonquin Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Maverick Creek Wind plant?
Maverick Creek Wind is in Eden, Concho County, Texas, at 31.2625° N, 99.8440° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Maverick Creek Wind's 492 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| White Mesa Wind | Crockett | 501 | 1,801,804 |
| Young Wind | Young | 500 | 1,569,063 |
| High Lonesome Wind Power, LLC Hybrid | Upton | 500 | 1,265,797 |
| Maverick Creek Wind | Concho | 492 | 1,555,334 |
| Hale Community Wind Farm | Hale | 478 | 1,936,494 |
| Mesquite Star | Nolan | 419 | 1,150,168 |
| Stephens Ranch Wind Energy LLC | Borden | 376 | 896,710 |
Source: EIA Forms EIA-860 and EIA-923, 2025.