Skip to main content
RateWatt

Natural gas power plant, Pennsylvania

Hill Top Energy Center, LLC natural gas power plant, Pennsylvania

Hill Top Energy Center, LLC is a 665 MW natural gas power plant in Greene County, Pennsylvania, operated by Hill Top Energy Center, LLC, and it generated 4,258,836 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.7% of the generation reported in Pennsylvania, and its capacity factor sits at the 91st percentile of U.S. natural gas plants. By 2025 generation it ranks 268th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

665 MWNameplate capacity
78%Capacity factor, 2025, 91st percentile, on 624 MW net summer
1.7%Of PA generation, 2025
4 yearsAverage generator age, by MW

How hard does the Hill Top Energy Center, LLC plant run compared with other natural gas plants?

The Hill Top Energy Center, LLC plant had a capacity factor of 78% in 2025 on 624 MW of net summer capacity, the 91st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 285 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hill Top Energy Center, LLC78%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hill Top Energy Center, LLC plant generating more or less than last year?

Generation at Hill Top Energy Center, LLC fell 16.4% from 2024 to 2025, from 5,091,305 MWh to 4,258,836 MWh. Through August 2026 it is running 3.4% behind the same months of 2025.

Net generation by period
PeriodMWh
20245,091,305
20254,258,836
2026 through August3,187,699
2025, same months3,300,160
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026451,595
July 2026441,390
June 2026404,185
May 2026418,782
April 2026263,632
March 2026439,045
February 2026385,799
January 2026383,271
December 2025411,983
November 202598,256
October 20256,344
September 2025442,093
August 2025451,193
July 2025451,716
June 2025428,584
May 2025445,385
April 2025348,994
March 2025450,325
February 2025298,562
January 2025425,401
December 2024432,800
November 2024440,939
October 2024315,606
September 2024439,776
August 2024451,988
July 2024456,947
June 2024432,067
May 2024458,842
April 2024327,735
March 2024455,929
February 2024430,919
January 2024447,757

Source: EIA Form EIA-923, through August 2026.

How much of Pennsylvania's electricity comes from the Hill Top Energy Center, LLC plant?

Hill Top Energy Center, LLC made 1.7% of the 245,706,645 MWh reported by Pennsylvania plants in 2025, from 1.3% of the state's 53,097 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 30th largest of 273 plants in Pennsylvania, the 534th largest of 14,327 in the U.S. and the 320th largest of 1,962 natural gas plants. By 2025 generation it is the 24th largest of 253 generating plants in the state.

Hill Top Energy Center, LLC within Pennsylvania, 2025
MeasureThis plantPennsylvaniaShare
Capacity (MW)66553,0971.3%
Generation (MWh)4,258,836245,706,6451.7%
Natural gas capacity (MW)66529,8802.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hill Top Energy Center, LLC plant, and when do they retire?

1 operable generator totals 665 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1665100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingNatural Gas Fired Combined Cycle6652021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hill Top Energy Center, LLC plant?

EIA lists no joint owners for Hill Top Energy Center, LLC. Hill Top Energy Center, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hill Top Energy Center, LLC plant?

Hill Top Energy Center, LLC is in Carmichaels, Greene County, Pennsylvania, at 39.8942° N, 79.9382° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Pennsylvania are similar in size?

Pennsylvania has 70 operable natural gas plants with 29,880 MW of capacity, and Hill Top Energy Center, LLC's 665 MW is 2% of that.

Natural gas plants in Pennsylvania around this size
PlantCountyMW2025 MWh
Ontelaunee Energy CenterBerks7284,114,446
Fayette Energy FacilityFayette7154,586,211
ArmstrongArmstrong6881,275,382
Hill Top Energy Center, LLCGreene6654,258,836
Lower Mount Bethel EnergyNorthampton6524,484,858
ShawvilleClearfield6261,054,049
Liberty Electric Power PlantDelaware6143,931,943

Source: EIA Forms EIA-860 and EIA-923, 2025.