Skip to main content
RateWatt

Natural gas power plant, Pennsylvania

Lower Mount Bethel Energy natural gas power plant, Pennsylvania

Lower Mount Bethel Energy is a 652 MW natural gas power plant in Northampton County, Pennsylvania, operated by Lower Mount Bethel Energy LLC, and it generated 4,484,858 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.8% of the generation reported in Pennsylvania, and its capacity factor sits at the 96th percentile of U.S. natural gas plants. By 2025 generation it ranks 250th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

652 MWNameplate capacity
85%Capacity factor, 2025, 96th percentile, on 602 MW net summer
1.8%Of PA generation, 2025
21 yearsAverage generator age, by MW

How hard does the Lower Mount Bethel Energy plant run compared with other natural gas plants?

The Lower Mount Bethel Energy plant had a capacity factor of 85% in 2025 on 602 MW of net summer capacity, the 96th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 311 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lower Mount Bethel Energy85%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Lower Mount Bethel Energy plant generating more or less than last year?

Generation at Lower Mount Bethel Energy rose 12.6% from 2024 to 2025, from 3,984,510 MWh to 4,484,858 MWh. Through August 2026 it is running 0.2% behind the same months of 2025.

Net generation by period
PeriodMWh
20243,984,510
20254,484,858
2026 through August2,993,940
2025, same months3,001,153
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026419,219
July 2026416,753
June 2026374,477
May 2026204,320
April 2026409,696
March 2026419,632
February 2026388,728
January 2026361,115
December 2025400,633
November 2025415,345
October 2025268,277
September 2025399,450
August 2025409,834
July 2025394,662
June 2025382,697
May 2025201,095
April 2025413,501
March 2025417,194
February 2025384,519
January 2025397,651
December 2024369,744
November 2024418,132
October 2024110,199
September 2024201,098
August 2024393,701
July 2024376,307
June 2024333,559
May 2024238,889
April 2024379,610
March 2024373,580
February 2024388,054
January 2024401,637

Source: EIA Form EIA-923, through August 2026.

How much of Pennsylvania's electricity comes from the Lower Mount Bethel Energy plant?

Lower Mount Bethel Energy made 1.8% of the 245,706,645 MWh reported by Pennsylvania plants in 2025, from 1.2% of the state's 53,097 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 31st largest of 273 plants in Pennsylvania, the 547th largest of 14,327 in the U.S. and the 330th largest of 1,962 natural gas plants. By 2025 generation it is the 22nd largest of 253 generating plants in the state.

Lower Mount Bethel Energy within Pennsylvania, 2025
MeasureThis plantPennsylvaniaShare
Capacity (MW)65253,0971.2%
Generation (MWh)4,484,858245,706,6451.8%
Natural gas capacity (MW)65229,8802.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lower Mount Bethel Energy plant, and when do they retire?

3 operable generators total 652 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3652100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
G1OperatingNatural Gas Fired Combined Cycle2122004n/a
G2OperatingNatural Gas Fired Combined Cycle2122004n/a
G3OperatingNatural Gas Fired Combined Cycle2292004n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lower Mount Bethel Energy plant?

Lower Mount Bethel Project Company LLC is the only joint owner reported for Lower Mount Bethel Energy, with 100.0%. Lower Mount Bethel Energy LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Lower Mount Bethel Energy plant?

Lower Mount Bethel Energy is in Bangor, Northampton County, Pennsylvania, at 40.8019° N, 75.1076° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Pennsylvania are similar in size?

Pennsylvania has 70 operable natural gas plants with 29,880 MW of capacity, and Lower Mount Bethel Energy's 652 MW is 2% of that.

Natural gas plants in Pennsylvania around this size
PlantCountyMW2025 MWh
Fayette Energy FacilityFayette7154,586,211
ArmstrongArmstrong6881,275,382
Hill Top Energy Center, LLCGreene6654,258,836
Lower Mount Bethel EnergyNorthampton6524,484,858
ShawvilleClearfield6261,054,049
Liberty Electric Power PlantDelaware6143,931,943
Allegheny Energy Units 3 4 & 5Allegheny5564,408,048

Source: EIA Forms EIA-860 and EIA-923, 2025.